Who Actually Won

Real federal rail grant awards, sourced from the awarding agency's own selection documents and announcements — not press coverage, not estimates. Every record below links to its source. This is a growing record, not a finished one; we add awards as they're confirmed.

957

Awards on record

$9.2B

Total awarded

54

States represented

Every other confirmed award

  • AK-LEG-CAPEX FY2026 · AK · Shortline

    32-mile freight rail extension from the Alaska Railroad mainline at Houston to Port MacKenzie, promised in 2012 project materials with a Fall 2015 ribbon cutting. As of 2025-2026, 25 of 32 miles of rail bed and 6 of 7 bridges are built; track, ties, ballast and signals were never installed on most of the line.

    Freight Rail Extension · Bridge · Track Rehabilitation

    Source →
  • New York City Department of Small Business Services

    $163.8M

    MEGA FY2026 · NY · Municipal

    From Truck to Barge: Modernizing Brooklyn Marine Terminal -- rebuilds the Brooklyn Marine Terminal (BMT): rehabilitates Pier 10, demolishes Piers 9A/9B and constructs a new Pier 9, improves traffic/circulation on the BMT campus.

    Transload

    Source →
  • California Department of Transportation

    $54.5M

    MEGA FY2026 · CA · State Dot · Rural

    Madera High-Speed Rail Station Project -- designs and constructs the Madera Station for the Merced-Bakersfield California High-Speed Rail (CHSR) Interim Service at the relocated Madera Amtrak Station location: new platforms, trackwork, overhead contact system, bus depot, parking, access roadway, multi-use path, station building.

    High Speed Rail · Passenger Rail Station · Station

    Source →
  • Maricopa Association of Governments

    $12.7M

    MEGA FY2026 · AZ · Public Authority

    Arizona Grand Avenue Improvements -- reconstructs the US 60 (Grand Avenue)/35th Avenue/Indian School Road intersection, eliminating two at-grade BNSF railroad crossings by elevating 35th Avenue and Indian School Road over Grand Avenue and the BNSF Railway. Also receives INFRA funding for a full MPDG award amount of $146,627,854.

    Grade Sep

    Source →
  • Wheeling & Lake Erie Railway

    $5.9M

    PA-RFAP FY2026 · PA · Regional Railroad

    Rehabilitate three rail bridges located on the Pittsburgh and Rook subdivisions, Washington County.

    Bridge

    Source →
  • Aberdeen Carolina and Western Railway

    $4.8M

    NC-FRRCSI FY2026 · NC · Short Line

    Rail replacement and improvements along Piedmont Division, Cabarrus and Mecklenburg counties.

    Track Rehabilitation

    Source →
  • Conrail

    $4.8M

    NJ-RFAP FY2026 · NJ · Terminal Railroad

    CP Port Capacity Project-Phase II, Elizabeth, Union County. Total project cost $5,374,795.00; sponsor share $537,479.50.

    Port Rail · Yard

    Source →
  • Buffalo & Pittsburgh Railroad

    $4M

    PA-RFAP FY2026 · PA · Short Line

    Improve 218 miles of the Main Line and P&W Subdivisions through replacements of 40 grade crossings, 80,000 feet of rail, 30,000 ties, and surfacing 48 miles of track. Armstrong, Butler, Clearfield, Elk, Jefferson, Lawrence, and McKean Counties.

    Track Rehabilitation · Crossing

    Source →
  • South Jersey Port Corporation

    $3.9M

    NJ-RFAP FY2026 · NJ · Port

    Balzano Marine Terminal Phase 4 Rail Improvements, Camden City, Camden County. Total project cost $4,752,914.00; sponsor share $864,166.10.

    Port Rail · Track Rehabilitation

    Source →
  • Interstate Waste

    $3.8M

    NJ-RFAP FY2026 · NJ · Private Industry

    NJRC Bridgewater Resources Rail Freight Project-Phase 2, Bridgewater Township, Somerset County. Total project cost $4,222,222.22; sponsor share $422,222.22.

    Track Rehabilitation

    Source →
  • Cape May Seashore Lines

    $3.6M

    NJ-RFAP FY2026 · NJ · Short Line

    Cape May Branch - Phase III, Middle Township, Cape May County. Total project cost $4,024,307.23; sponsor share $402,430.72.

    Track Rehabilitation

    Source →
  • Central New York Railroad

    $3.4M

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate Bridge 192.22 near Susquehanna, Susquehanna County.

    Bridge

    Source →
  • Southwest Pennsylvania Railroad

    $3.2M

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate 3 miles of rail replacing jointed rail on the Radebaugh Subdivision with welded rail, Westmoreland County.

    Cwr · Track Rehabilitation

    Source →
  • Snavely's Mill

    $3.2M

    PA-RFAP FY2026 · PA · Private Industry

    Construct two new rail spurs and rehabilitate over 3,000 feet of track at its transloading facility, Clinton County.

    Spur · Track Rehabilitation

    Source →
  • Pittsburg & Shawmut Railroad

    $3.1M

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate approximately 20 miles of track on the Laurel Subdivision, an additional 6 miles of track, install two switch machines, and improve a grade crossing in the Butler Yard. Butler, Cameron, and Elk Counties.

    Track Rehabilitation · Crossing

    Source →
  • RJ Corman Railroad Company Lehigh Line

    $3M

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate approximately 22 miles of track along the Lehigh Line with ties, ballast, and surfacing, Bradford and Wyoming Counties.

    Track Rehabilitation

    Source →
  • Winchester & Western Railroad

    $2.8M

    NJ-RFAP FY2026 · NJ · Short Line

    Seashore Branch access to Whibco Phase II, Millville City, Cumberland County. Total project cost $3,157,602.00; sponsor share $367,266.30.

    Track Rehabilitation

    Source →
  • The New York, Susquehanna and Western Railway Corp

    $2.8M

    NJ-RFAP FY2026 · NJ · Short Line

    Installation of Curve Patch Rail, Ties, Ballast & Surface Main Phase 3, Hardyston Township and Kinnelon Borough/Sparta Township and Vernon Township, Morris and Sussex Counties. Total project cost $3,090,045.00; sponsor share $316,803.00.

    Track Rehabilitation

    Source →
  • Berks County Redevelopment Authority

    $2.6M

    PA-RFAP FY2026 · PA · Public Authority

    Replace 1,600 feet of existing track, construct 2,430 feet of new track and a siding to serve the Boyertown Foundry, Berks County.

    Track Rehabilitation · Siding

    Source →
  • SEDA-COG Joint Rail Authority

    $2.1M

    PA-RFAP FY2026 · PA · Public Authority

    Rehabilitate five bridges on the Nittany & Bald Eagle Railroad (NBER) Nittany Main and the Bellefonte Branch, Blair and Centre Counties.

    Bridge

    Source →
  • Allegheny Valley Railroad

    $2.1M

    PA-RFAP FY2026 · PA · Short Line

    Replace 1.3 miles of jointed rail with new 136 lb. rail on the Allegheny Subdivision, Allegheny County.

    Track Rehabilitation

    Source →
  • Lehigh Valley Rail Management

    $2.1M

    PA-RFAP FY2026 · PA · Short Line

    Replace approximately 7,000 ties and install 10 new turnouts at its Johnstown rail facility, Cambria County.

    Track Rehabilitation

    Source →
  • Conrail

    $1.7M

    PA-RFAP FY2026 · PA · Terminal Railroad

    Replace 11 turnouts within Stoney Creek Yard, including replacements with steel timbers, Delaware County.

    Yard · Track Rehabilitation

    Source →
  • Great Smoky Mountains Railroad

    $1.7M

    NC-FRRCSI FY2026 · NC · Short Line

    Track improvements and bridge repairs on mainline corridor, Jackson, Swain, Macon, and Cherokee counties.

    Bridge · Track Rehabilitation

    Source →
  • Greiner Packaging Corp.

    $1.6M

    PA-RFAP FY2026 · PA · Private Industry

    Construct a 0.2 mile spur and 1,600-linear-foot vacuum push/pull system to transfer resin from the railyard to on-site silos, Luzerne County.

    Spur

    Source →
  • Salem County

    $1.5M

    NJ-RFAP FY2026 · NJ · County

    FY 2026 RFAP Salem County Railroad Improvements, Various Locations, Pilesgrove Township/Woodstown Borough, Salem County. Total project cost $1,668,199.05; sponsor share $166,819.91.

    Track Rehabilitation

    Source →
  • York Railway

    $1.5M

    PA-RFAP FY2026 · PA · Short Line

    Improve track in the Lincoln Yard with rail replacement, upgrading turnouts, and surfacing two grade crossings, York County.

    Track Rehabilitation · Crossing

    Source →
  • IA-RRLGP FY2026 · Iowa

    This project is for the rail portion of a new facility at Midport America Business Park at the Waterloo Airport, replacing an existing facility that cannot expand.

    Targeted Jobs

    Source →
  • Carolina Coastal Railway

    $1.2M

    NC-FRRCSI FY2026 · NC · Short Line

    Rail and bridge improvements on Belhaven and NS lines, Beaufort, Greene, Washington, and Wilson counties.

    Bridge · Track Rehabilitation

    Source →
  • Strasburg Rail Road

    $1.2M

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate approximately 3,000 feet of track, improve a grade crossing, and install permanent bulk transloading equipment, Lancaster County.

    Track Rehabilitation · Crossing

    Source →
  • Winston-Salem Southbound Railroad

    $1.1M

    NC-FRRCSI FY2026 · NC · Short Line

    Rail improvements on W line, Davidson County.

    Track Rehabilitation

    Source →
  • Pittsburgh & Ohio Central Railroad

    $1.1M

    PA-RFAP FY2026 · PA · Short Line

    Construct approximately 4,800 feet of new track in the Scully Yard and rehabilitate 10,560 linear feet of track on the Arden Subdivision, Washington County.

    Track Rehabilitation

    Source →
  • Black River & Western Railroad

    $1.0M

    NJ-RFAP FY2026 · NJ · Short Line

    Bridge 14.01 Improvements, Raritan Township, Hunterdon County. Total project cost $1,142,038.00; sponsor share $114,260.50.

    Bridge

    Source →
  • Sekisui Kydex, LLC

    $1M

    PA-RFAP FY2026 · PA · Private Industry

    Remove an existing siding and construct a new extended siding to increase capacity at its Bloomsburg South Campus Facility, Columbia County.

    Siding

    Source →
  • RJ Corman Railroad Company Pennsylvania Lines

    $1M

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate approximately 8 miles of track along the Cresson and Wallaceton Subdivisions with ties, ballast, and surfacing, Cambria and Clearfield Counties.

    Track Rehabilitation

    Source →
  • MN-MRSI FY2026 · Minnesota

    JMJ Properties RR Expansion

    Rail Service Improvement

    Source →
  • MN-MRSI FY2026 · Minnesota

    Denco II Rail

    Rail Service Improvement

    Source →
  • Raleigh & Fayetteville Railroad

    $999,586

    NC-FRRCSI FY2026 · NC · Short Line

    Rail corridor improvements to NS and VF lines, Wake and Harnett counties.

    Track Rehabilitation

    Source →
  • North Carolina and Virginia Railroad

    $979,813

    NC-FRRCSI FY2026 · NC · Short Line

    Rail replacement and improvements on mainline corridor, Northampton County.

    Track Rehabilitation

    Source →
  • Philadelphia Regional Port Authority (PhilaPort)

    $974,473

    PA-RFAP FY2026 · PA · Port

    Rehabilitate 2,600 feet of rail storage track and replace a turnout at Tioga Marine Terminal, Philadelphia County.

    Port Rail · Track Rehabilitation

    Source →
  • Pennsylvania & Southern Railway

    $912,000

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate over 6,000 feet on the outbound and inbound tracks serving the Cumberland Valley Business Park in Chambersburg, Franklin County.

    Track Rehabilitation

    Source →
  • MN-MRSI FY2026 · Minnesota

    Lake Agassiz Bean Rail Siding

    Rail Service Improvement

    Source →
  • Delaware and Raritan River Railroad LLC

    $885,137

    NJ-RFAP FY2026 · NJ · Short Line

    DRR Grade Crossing Approach Improvements, Freehold, Monmouth County. Total project cost $983,485.00; sponsor share $98,348.50.

    Crossing

    Source →
  • North Carolina Ports (Morehead City)

    $844,860

    NC-FRRCSI FY2026 · NC · Port

    Rail replacement and upgrades, Carteret County.

    Port Rail · Track Rehabilitation

    Source →
  • MN-MRSI FY2026 · Minnesota

    Cloquet Terminal Railroad Mainline Upgrade Phase 1

    Rail Service Improvement

    Source →
  • MetalTech

    $840,000

    PA-RFAP FY2026 · PA · Private Industry

    Replace approximately 2,000 feet of rail and rebuild a 250-foot concrete embedded grade crossing at its metals processing facility, Allegheny County.

    Track Rehabilitation · Crossing

    Source →
  • IA-RRLGP FY2026 · Iowa

    This project will reconstruct, improve and expand an existing rail facility in Sioux City. Improvements will allow for expanded commodity volumes and types to pass through this location.

    Infrastructure Improvements

    Source →
  • Morristown & Erie Railway

    $828,837

    NJ-RFAP FY2026 · NJ · Short Line

    M&E 3-Bridge Modification and Upgrade Project, Morris Township/Morristown Town, Morris County. Total project cost $920,929.50; sponsor share $92,092.95.

    Bridge

    Source →
  • H&K Group, Inc.

    $827,000

    PA-RFAP FY2026 · PA · Private Industry

    Rehabilitate and improve the track siding at the Birdsboro Quarry, Berks County.

    Siding · Track Rehabilitation

    Source →
  • South Avis Realty

    $819,000

    PA-RFAP FY2026 · PA · Private Industry

    Replace ties and rehabilitate three grade crossings throughout its facility, Clinton County.

    Track Rehabilitation · Crossing

    Source →
  • Peachey Rail Works

    $810,000

    PA-RFAP FY2026 · PA · Private Industry

    Construct two additional tracks and install unloading equipment, Lebanon County.

    Track Rehabilitation

    Source →
  • IA-RRLGP FY2026 · Iowa

    This project expands the capacity of the current 4-acre transload site, adding additional rail car capacity and a laydown yard to a new 4.9-acre site to the south.

    Infrastructure Improvements

    Source →
  • Aberdeen and Rockfish Railroad

    $771,397

    NC-FRRCSI FY2026 · NC · Short Line

    Track upgrades and service continuity on AR Mainline, Hoke County.

    Track Rehabilitation

    Source →
  • Yadkin Valley Railroad

    $754,700

    NC-FRRCSI FY2026 · NC · Short Line

    Track upgrades and rail corridor improvements on K and CF lines, Yadkin, Surry, and Stokes counties.

    Track Rehabilitation

    Source →
  • MN-MRSI FY2026 · Minnesota

    Minnesota Northern Railroad Spur Phase 2 Crookston Industrial Park

    Rail Service Improvement

    Source →
  • Allen Distribution

    $722,000

    PA-RFAP FY2026 · PA · Private Industry

    Construct three rail sidings at a 625,000-square-foot logistics center connecting to a Norfolk Southern line in Jackson Township, Lebanon County.

    Siding

    Source →
  • Chesapeake & Albemarle Railroad

    $712,801

    NC-FRRCSI FY2026 · NC · Short Line

    Bridge and track improvements on mainline corridor and Edenton siding, Camden, Pasquotank, Perquimans, and Chowan counties.

    Bridge · Track Rehabilitation

    Source →
  • Union Railroad

    $700,000

    PA-RFAP FY2026 · PA · Short Line

    Replace ties within seven tracks within the Ore Yard and four tracks on the Joe Wolf Yard, Allegheny County.

    Track Rehabilitation · Yard

    Source →
  • Atlantic & Western Railway

    $690,440

    NC-FRRCSI FY2026 · NC · Short Line

    Corridor improvements and rail track upgrades on Jonesboro branch, Lee County.

    Track Rehabilitation

    Source →
  • Riverside Materials Inc.

    $679,000

    PA-RFAP FY2026 · PA · Private Industry

    Rehabilitate their industrial unloading and conveying system used to unload unit trains of aggregates, Philadelphia County.

    Equipment

    Source →
  • Redevelopment Authority of Luzerne County

    $673,000

    PA-RFAP FY2026 · PA · Public Authority

    Rehabilitate a grade crossing and approximately 10 miles of spot tie replacement, Luzerne County.

    Crossing · Track Rehabilitation

    Source →
  • Wilmington Terminal Railroad

    $627,000

    NC-FRRCSI FY2026 · NC · Short Line

    Rail and switch improvements on mainline corridor, New Hanover County.

    Track Rehabilitation · Siding

    Source →
  • Alexander Railroad Company

    $495,026

    NC-FRRCSI FY2026 · NC · Short Line

    Track and grade-crossing upgrades on mainline corridor, Iredell County.

    Track Rehabilitation · Crossing

    Source →
  • Consolidated Scrap Resources

    $455,000

    PA-RFAP FY2026 · PA · Private Industry

    Rehabilitate existing track and construct new rail track within its 28-acre Harrisburg yard, Dauphin County.

    Track Rehabilitation

    Source →
  • Alexander Railroad Company

    $381,797

    NC-FRRCSI FY2026 · NC · Short Line

    Track and corridor upgrades near Alexander Industrial Park, Alexander County.

    Track Rehabilitation

    Source →
  • Morris County

    $318,600

    NJ-RFAP FY2026 · NJ · County

    Rehabilitation of Rail Bridge 14D30.78 in Rockaway Borough, Morris County. Total project cost $354,000.00; sponsor share $35,400.00.

    Bridge

    Source →
  • Everett Railroad

    $285,000

    PA-RFAP FY2026 · PA · Short Line

    Rehabilitate the approach, masonry substructure, and bridge deck on a railroad bridge span in Freedom Township, Blair County.

    Bridge

    Source →
  • IA-RRLGP FY2026 · Iowa

    This project will increase the capacity at the Rustin Street transload site to an additional 8 tank cars. This location transloads liquid by-product from a local meat processing facility.

    Infrastructure Improvements

    Source →
  • North Carolina Ports (Morehead City)

    $177,500

    NC-FRRCSI FY2026 · NC · Port

    Rail scale installation, Carteret County.

    Port Rail

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate three rail bridges located on the Pittsburgh and Rook subdivisions

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    improve 218 miles of the Main Line and P&W Subdivisions through replacements of 40 grade crossings, 80,000 feet of rail, 30,000 ties, and surfacing 48 miles of track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate Bridge 192.22 near Susquehanna

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate 3 miles of rail replacing jointed rail on the Radebaugh Subdivision with welded rail

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    construct two new rail spurs and rehabilitate over 3,000 feet of track at its transloading facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate approximately 20 miles of track on the Laurel Subdivision, an additional 6 miles of track, install two switch machines, and improve a grade crossing in the Butler Yard

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate approximately 22 miles of track along the Lehigh Line with ties, ballast, and surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    replace 1,600 feet of existing track, construct 2,430 feet of new track and a siding to serve the Boyertown Foundry

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate five bridges on the Nittany & Bald Eagle Railroad (NBER) Nittany Main and the Bellefonte Branch

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    replace 1.3 miles of jointed rail with new 136 lb. rail on the Allegheny Subdivision

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    replace approximately 7,000 ties and install 10 new turnouts at its Johnstown rail facility

    Rail Freight Infrastructure

    Source →
  • ALCIVIA

    $2.0M

    WI-FRIIP FY2025 · Wisconsin · 95.39% match

    Construct 697ft of track and a railloadout system

    Freight Rail Infrastructure/Preservation

    Source →
  • IA-RRLGP FY2025 · Iowa

    Heartland Co-op Greenfield Rail Loading Elevator

    Rail Network Improvement

    Source →
  • Conrail

    $1.7M

    PA-COMBINED FY2025 · Pennsylvania

    replace 11 turnouts within Stoney Creek Yard and includes replacements with steel timbers

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    construct a 0.2 mile spur and 1,600-linear- foot vacuum push/pull system to transfer resin from the railyard to on-site silos

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2025 · Wisconsin · 44.01% match

    Upgrade conveying and weighing equipment and add 140,000bu of upright storage space

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    improve track in the Lincoln Yard with rail replacement, upgrading turnouts, and surfacing two grade crossings

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2025 · Iowa

    A-line EDS Rail Spur

    Targeted Job Creation

    Source →
  • WI-FRIIP FY2025 · Wisconsin · 0.66% match

    Construct 2,053ft of track

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate approximately 3,000 feet of track, improve a grade crossing, and install permanent bulk transloading equipment

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    construct approximately 4,800 feet of new track in the Scully Yard and rehabilitate 10,560 linear feet of track on the Arden Subdivision

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    remove an existing siding and construct a new extended siding to increase capacity at its Bloomsburg South Campus Facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate approximately 8 miles of track along the Cresson and Wallaceton Subdivisions with ties, ballast, and surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate 2,600 feet of rail storage track and replace a turnout at Tioga Marine Terminal

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2025 · Iowa

    Reid Line Dexter Rail Yard Improvements

    Rail Network Improvement

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate over 6,000 feet on the outbound and inbound tracks serving the Cumberland Valley Business Park in Chambersburg

    Rail Freight Infrastructure

    Source →
  • MetalTech

    $840,000

    PA-COMBINED FY2025 · Pennsylvania

    replace approximately 2,000 feet of rail and rebuilt a 250- foot concrete embedded grade crossing at its metals processing facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate and improve the track siding at the Birdsboro Quarry

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    replace ties and rehabilitate three grade crossings throughout its facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    construct two additional tracks and install unloading equipment

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    construct three rail sidings at a 625,000-square-foot logistics center connecting to a Norfolk Southern line in Jackson Township

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    replace ties within seven tracks within the Ore Yard and four tracks on the Joe Wolf Yard

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate their industrial unloading and conveying system used to unload unit trains of aggregates

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate a grade crossing and approximately 10 miles of spot tie replacement

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2025 · Iowa

    Appanoose Country Rail Extension

    Targeted Job Creation

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate existing track and construct new rail track within its 28-acre Harrisburg yard

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2025 · Pennsylvania

    rehabilitate the approach, masonry substructure, and bridge deck on a railroad bridge span in Freedom Township

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2025 · Iowa

    BJRY Rail Yard and Transload

    Rail Network Improvement

    Source →
  • IA-RRLGP FY2025 · Iowa

    Webster City Rail Port Planning and Development

    Rail Port Planning & Development

    Source →
  • City of Long Beach

    $283.4M

    MEGA FY2024 · CA · Municipal

    America's Green Gateway: Pier B Rail Program Buildout -- completes the Pier B On-Dock Rail support Facility Program via North and South Rail Yard Expansions: two new mainline tracks, five new 10,000-foot receiving/departure tracks, 26 new storage tracks north of the existing Pier B Yard, seven new 3,000-foot storage tracks, two new tracks in the Pico Avenue Rail Corridor, active at-grade warning devices and railroad pre-emption.

    Yard · Port Rail

    Source →
  • CRISI FY2024 · NY · State Dot · 60% match

    Bridge · Passenger Capital

    Source →
  • CRISI FY2024 · IL · Municipal · 20% match

    Passenger Capital · Grade Sep

    Source →
  • City of Stuart

    $130.5M

    MEGA FY2024 · FL · Municipal

    St. Lucie River Railroad Bridge Replacement Project -- replaces the existing 100-year-old St. Lucie River Railroad Bridge with a new double-track structure with significantly improved vertical and horizontal navigational clearances.

    Bridge Replacement

    Source →
  • CRISI FY2024 · NC · Shortline · 38% match

    Siding · Track Rehab

    Source →
  • CRISI FY2024 · CA · Public Authority · 68.25% match

    Resilience

    Source →
  • Port of New Orleans

    $73.8M

    MEGA FY2024 · LA · Port

    Louisiana International Terminal Project -- constructs a new, non-air-draft-restricted container terminal on the Gulf Coast, including ~1,700 feet of wharf, an automated stacking crane yard, intermodal rail yard, and realignment of the Norfolk Southern rail and St. Bernard Highway. Also receives INFRA funding for a full MPDG award amount.

    Port Rail · Intermodal

    Source →
  • CRISI FY2024 · WI · State Dot · 20% match

    Yard · Bridge

    Source →
  • CRISI FY2024 · MI · State Dot · 40% match

    Intermodal

    Source →
  • CRISI FY2024 · CO · State Dot · 30% match

    Ptc · Siding · Crossing

    Source →
  • CRISI FY2024 · DC · Amtrak · 20% match

    Safety Tech

    Source →
  • CRISI FY2024 · OK · Shortline · 30% match

    Cwr · Crossing

    Source →
  • CRISI FY2024 · ME · State Dot · 20% match

    Track Rehab · Cwr · Crossing

    Source →
  • CRISI FY2024 · CO · Shortline Holdco · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · PA · Shortline · 20% match

    Research

    Source →
  • CRISI FY2024 · AK · Shortline · 20% match

    Bridge

    Source →
  • CRISI FY2024 · IL · Shortline Holdco · 20% match

    Yard

    Source →
  • CRISI FY2024 · LA · Shortline · 20% match

    Bridge · Track Rehab

    Source →
  • CRISI FY2024 · WA · State Dot · 35% match

    Track Rehab

    Source →
  • CRISI FY2024 · MN · Shortline · 21% match

    Track Rehab · Cwr

    Source →
  • CRISI FY2024 · MA · State Dot · 20% match

    Passenger Capital

    Source →
  • CRISI FY2024 · CA · State Agency · 28% match

    Locomotive

    Source →
  • CRISI FY2024 · KY · Shortline Holdco · 25% match

    Track Rehab

    Source →
  • CRISI FY2024 · GA · Shortline Holdco · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · AZ · Amtrak · 20% match

    Siding

    Source →
  • CRISI FY2024 · IA · Shortline · 20% match

    Bridge

    Source →
  • CRISI FY2024 · OR · Port · 40% match

    Track Rehab · Siding

    Source →
  • CRISI FY2024 · OK · Shortline · 21% match

    Track Rehab · Bridge

    Source →
  • CRISI FY2024 · SC · County · 20% match

    Track Rehab · Signal

    Source →
  • CRISI FY2024 · LA · Shortline · 20% match

    Track Rehab · 286k

    Source →
  • CRISI FY2024 · MI · Shortline · 51% match

    Cwr · Crossing

    Source →
  • CRISI FY2024 · GA · Port · 51% match

    Yard · Port Rail

    Source →
  • CRISI FY2024 · WA · Port · 20% match

    Port Rail

    Source →
  • CRISI FY2024 · CA · Public Authority · 50% match

    Passenger Capital

    Source →
  • CRISI FY2024 · WA · Shortline · 21% match

    Cwr · Class Upgrade

    Source →
  • CRISI FY2024 · WV · Shortline · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · CA · Shortline · 30% match

    Track Rehab

    Source →
  • CRISI FY2024 · MA · Shortline · 30% match

    Track Rehab · Siding

    Source →
  • CRISI FY2024 · AZ · Shortline · 30% match

    Track Rehab · Bridge

    Source →
  • CRISI FY2024 · IN · Shortline · 35% match

    Equipment

    Source →
  • CRISI FY2024 · ND · Shortline · 20% match

    Track Rehab · Siding

    Source →
  • ASLRRA

    $20.5M

    CRISI FY2024 · DC · Trade Assoc · 20% match

    Data

    Source →
  • CRISI FY2024 · CA · Shortline · 20% match

    Locomotive

    Source →
  • CRISI FY2024 · CA · Passenger · 20% match

    Trespass

    Source →
  • CRISI FY2024 · KS · Shortline Holdco · 20% match

    Locomotive

    Source →
  • CRISI FY2024 · VT · Shortline · 25% match

    Track Rehab · Bridge · Yard

    Source →
  • CRANDIC

    $19.0M

    CRISI FY2024 · IA · Shortline · 20% match

    Track Rehab

    Source →
  • Caltrans

    $18.7M

    CRISI FY2024 · CA · State Dot · 47% match

    Passenger Capital

    Source →
  • CRISI FY2024 · MS · Shortline · 30% match

    Siding · Cwr · Crossing

    Source →
  • CRISI FY2024 · NC · Shortline · 52% match

    Cwr · 286k · Class Upgrade

    Source →
  • CRISI FY2024 · TX · Shortline · 30% match

    Track Rehab

    Source →
  • CRISI FY2024 · MI · Municipal · 35% match

    Track Rehab · Yard

    Source →
  • CRISI FY2024 · NY · County · 25% match

    Locomotive

    Source →
  • CRISI FY2024 · MN · Shortline · 20% match

    Locomotive

    Source →
  • CRISI FY2024 · DE · University · 20% match

    Workforce

    Source →
  • CRISI FY2024 · DC · Amtrak · 20% match

    Workforce

    Source →
  • CRISI FY2024 · TN · Shortline · 30% match

    Track Rehab · 286k · Class Upgrade

    Source →
  • CRISI FY2024 · OR · Shortline · 20% match

    Track Rehab · 286k · Class Upgrade

    Source →
  • CRISI FY2024 · TX · Shortline Holdco · 31% match

    Track Rehab · Crossing

    Source →
  • CRISI FY2024 · CA · Shortline · 25% match

    Locomotive

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate and improve the condition of the 25th Street Viaduct

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · OH · State Agency · 35% match

    Track Rehab · Yard

    Source →
  • CRISI FY2024 · OH · State Agency · 25% match

    Track Rehab

    Source →
  • CRISI FY2024 · MN · Shortline · 20% match

    Cwr

    Source →
  • CRISI FY2024 · NY · Port · 30% match

    Track Rehab · 286k

    Source →
  • CRISI FY2024 · CO · University · 36% match

    Research

    Source →
  • CRISI FY2024 · WA · Shortline · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · CA · Shortline · 23% match

    Locomotive

    Source →
  • CRISI FY2024 · TN · Shortline · 25% match

    Track Rehab · 286k · Class Upgrade

    Source →
  • CRISI FY2024 · VA · Labor · 20% match

    Research

    Source →
  • CRISI FY2024 · PA · Public Authority · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · MA · Shortline · 25% match

    Track Rehab

    Source →
  • CRISI FY2024 · GA · State Dot · 20% match

    Track Rehab · Bridge · Spur

    Source →
  • CRISI FY2024 · MI · Amtrak · 20% match

    Passenger Capital

    Source →
  • CRISI FY2024 · WA · Municipal · 23% match

    Locomotive

    Source →
  • CRISI FY2024 · PA · Amtrak · 20% match

    Trespass

    Source →
  • CRISI FY2024 · MS · Shortline · 23% match

    Track Rehab · Crossing · Spur

    Source →
  • CRISI FY2024 · FL · Shortline · 21% match

    Track Rehab · Class Upgrade

    Source →
  • CRISI FY2024 · OH · Shortline Holdco · 20% match

    Bridge

    Source →
  • CRISI FY2024 · PA · University · 20% match

    Research

    Source →
  • CRISI FY2024 · IN · Shortline · 50% match

    Bridge

    Source →
  • CRISI FY2024 · WA · State Dot · 50% match

    Signal

    Source →
  • CRISI FY2024 · MT · University · 20% match

    Workforce

    Source →
  • CRISI FY2024 · CA · Shortline · 40% match

    Locomotive

    Source →
  • CRISI FY2024 · DE · Amtrak · 20% match

    Workforce

    Source →
  • CRISI FY2024 · OH · State Agency · 20% match

    Track Rehab · Class Upgrade

    Source →
  • CRISI FY2024 · VA · Shortline · 50% match

    Track Rehab

    Source →
  • CRISI FY2024 · VA · Public Authority · 50% match

    Passenger Capital

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate six bridges to contribute to the long-term safety of train operations

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · NE · Shortline · 25% match

    Track Rehab · Transload

    Source →
  • CRISI FY2024 · IN · Shortline · 20% match

    Bridge

    Source →
  • CRISI FY2024 · TX · Shortline · 25% match

    Yard · Siding

    Source →
  • CRISI FY2024 · AR · Shortline Holdco · 20% match

    Yard · Siding

    Source →
  • CRISI FY2024 · AZ · Municipal · 20% match

    Passenger Capital

    Source →
  • CRISI FY2024 · TX · Shortline · 30% match

    Bridge

    Source →
  • CRISI FY2024 · IN · University · 22% match

    Research

    Source →
  • CRISI FY2024 · OR · Shortline · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · NJ · Shortline · 35% match

    Track Rehab · Siding

    Source →
  • CRISI FY2024 · NM · County · 20% match

    New Line

    Source →
  • CRISI FY2024 · NY · Shortline · 48% match

    Cwr · 286k

    Source →
  • CRISI FY2024 · CA · University · 20% match

    Research

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    expand the Kinder Morgan terminal rail yard by adding 13,350 feet of new track and improve the current rail infrastructure

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · PA · Shortline · 21% match

    Track Rehab · Class Upgrade

    Source →
  • CRISI FY2024 · TX · Shortline · 30% match

    Track Rehab · Bridge

    Source →
  • CRISI FY2024 · WY · Shortline · 20% match

    Locomotive

    Source →
  • CRISI FY2024 · OR · Shortline · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · AZ · Shortline · 20% match

    Locomotive

    Source →
  • CRISI FY2024 · OH · State Agency · 35% match

    Track Rehab · Crossing

    Source →
  • CRISI FY2024 · FL · State Dot · 46% match

    Crossing

    Source →
  • CRISI FY2024 · MS · Port · 33.8% match

    Spur

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace 43,930 linear feet of rail on the Cresson and Cherry Tree divisions

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate track on the Laurel Subdivision, including tie replacement, track surfacing, brush cutting, grade crossing rehabilitation, and installation of an equipment defect detector

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace 1,386 ties and upgrade rail on the High Grade Bridge

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    expand rail car storage and construct supporting unloading equipment

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2024 · Wisconsin · 17.04% match

    Construct 4,172 feet of industry track

    Freight Rail Infrastructure/Preservation

    Source →
  • E&LS

    $2.4M

    WI-FRPP FY2024 · Wisconsin · 20% match

    Bridge U-330 replacement & track rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate seven bridges and one culvert on the Juniata Valley Railroad and Nittany Bald Eagle Railroad

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    construct approximately 4,800 feet of new track in the Scully Yard and rehabilitate 10,560 linear feet of track on the Arden Subdivision

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · CA · Public Authority · 20% match

    Workforce

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate 2.5 miles of rail replacing jointed rail on the Radebaugh Subdivision with welded rail

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · IL · Public Authority · 20% match

    Planning

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace 2.33 miles of jointed rail realign track on the Allegheny Subdivision between Penn Hills Township and the City of Pittsburgh

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate and replace rail on North Shore’s mainline

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · UT · State Dot · 20% match

    Grade Sep

    Source →
  • CRISI FY2024 · WA · Shortline · 21% match

    Bridge · 286k

    Source →
  • CRISI FY2024 · OH · State Agency · 20% match

    Planning

    Source →
  • CRISI FY2024 · OR · Municipal · 20% match

    Track Rehab

    Source →
  • CRISI FY2024 · TN · Municipal · 33% match

    Yard

    Source →
  • MN-MRSI FY2024 · Minnesota

    Crookston Industrial Park and Innovation Center (Phase 1)

    Rail Service Improvement

    Source →
  • CRISI FY2024 · VA · Municipal · 20.2% match

    Passenger Capital

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate track in the Poorhouse Yard with rail and tie replacement and track surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    construct a brand new rail spur and install new rail car unloading/loading equipment

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2024 · Minnesota

    Echo Agronomy Siding Track Construction

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    install 4,735 track feet of newly constructed track and rehabilitate 240 track feet of track at the Riverside Industrial Complex in Bristol, PA

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · CO · Shortline · 25% match

    Track Rehab

    Source →
  • MN-MRSI FY2024 · Minnesota

    Crookston Packaged Product Rail Transportation Capacity Increase

    Rail Service Improvement

    Source →
  • CRISI FY2024 · OH · Municipal · 20% match

    Crossing

    Source →
  • WI-FRIIP FY2024 · Wisconsin · 0% match

    Construct grain hoop barn

    Freight Rail Infrastructure/Preservation

    Source →
  • Maryland DOT

    $800,000

    CRISI FY2024 · MD · State Dot · 20% match

    Planning

    Source →
  • CRISI FY2024 · IN · County · 20% match

    Spur

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace ties, rail, ballast, and surface 2,000 feet of track at Shale Rail’s Wysox facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    construct a new mainline turnout and 2,145 feet of new truck to connect to the Luzerne & Susquehanna Railway

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate two at- grade crossings and replace ties on two bridges

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    construct 1,200 linear feet of new track and construct unloading equipment

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    reconstruct a rail-crane frog to safe working order

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate and construct new loading/unloading equipment at four existing rail stations

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2024 · Minnesota

    Camp Ripley Spur Crossings Improvement Project

    Rail Service Improvement

    Source →
  • CRISI FY2024 · NM · Municipal · 53% match

    Grade Sep

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace four turnouts and replace rail on three siding tracks

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace bridge timbers and rail on the main track bridge over the Shenango River

    Rail Freight Infrastructure

    Source →
  • Dyer Quarry

    $498,000

    PA-COMBINED FY2024 · Pennsylvania

    rehabilitate four yard tracks and replace up to 1,500 rail ties

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    furnish and install 4,000 new crossties to improve 17 miles of track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    replace six turnouts, rehabilitate and construct 300 feet of track at the SPC facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    furnish and install 4,000 new crossties across three miles of the Stony Creek Branch and six miles of the Bethlehem Branch

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    rehabilitate eight bridges on the Octoraro, Perkiomen, Lancaster Northern, and York branch lines

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    reconstruct an existing 1,300 feet of track at the Tioga Marine Terminal

    Rail Freight Infrastructure

    Source →
  • CRISI FY2024 · MI · University · 20% match

    Research

    Source →
  • MN-MRSI FY2024 · Minnesota

    Sanimax USA Rail Project

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2024 · Pennsylvania

    extend and rehabilitate a current rail siding and install a railroad car scale

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2024 · Minnesota

    Hector, MN Warehouse/ Transload

    Rail Service Improvement

    Source →
  • CRISI FY2024 · FL · Municipal · 20% match

    Workforce

    Source →
  • CRISI FY2024 · FL · Municipal · 20% match

    Trespass

    Source →
  • CRISI FY2024 · FL · Municipal · 20% match

    Trespass

    Source →
  • CRISI FY2024 · NY · County · 20% match

    Trespass

    Source →
  • CRISI FY2023 · AL

    THE OBJECTIVE OF THE PROJECT IS TO EXPAND RAIL CAPACITY TO SUPPORT FREIGHT TRANSPORTATION NEEDS AND ENABLE EFFICIENT AND COST-EFFECTIVE MOVEMENT OF INTERNATIONAL EXPORTS AND IMPORTS THROUGH ALABAMA, AS WELL AS OTHER PARTS OF THE USA. THE ALABAMA STATE PORT AUTHORITY ( ASPA ) WILL USE THE CRISI GRANT TO SUPPORT THE ENGINEERING DESIGN, ENVIRONMENTAL REVIEW, AND THE CONSTRUCTION OF TWO SUBPROJECTS: (1) AN INLAND INTERMODAL CONTAINER TRANSFER FACILITY (ICTF) IN MONTGOMERY, ALABAMA AND (2) THE CHICKASAW LEAD TRACK IN MOBILE, ALABAMA (COLLECTIVELY THE PROJECT). THE MONTGOMERY ICTF WILL PROVIDE AN ALTERNATE SHIPPING TRANSPORT OPTION FOR EXISTING BUSINESSES BETWEEN ASPA S PORT OF MOBILE (PORT) AND CENTRAL ALABAMA. IT WOULD ALSO REDUCE CONTAINER STORAGE CONGESTION AT THE PORT AND DECREASE TRUCK TR

    Intermodal · Port Rail · Spur

    Source →
  • CRISI FY2023 · FL

    THE PURPOSE OF THE PROJECT IS TO IMPROVE OPERATIONS AT THE INTERCHANGE OF THE CSXT, FECR AND NSR RAILROADS IN THE CITY OF JACKSONVILLE, FLORIDA. THE UPGRADED SWITCHES, GRADE CROSSING SAFETY UPGRADES, AND COMMUNICATION SYSTEM INFRASTRUCTURE IMPROVEMENTS WILL IMPROVE FREIGHT RAIL OPERATIONS, WHILE AFFORDING CLEAR COMMUNITY BENEFITS INCLUDING: REDUCED DELAYS FOR VEHICULAR, PEDESTRIAN, AND BICYCLE TRAFFIC IMPROVED AND RELIABLE ACCESS TO A MAJOR MEDICAL CENTER FOR FIRST RESPONDERS INCREASING SAFETY BY LIMITING ACCESS TO THE TRACK FOR TRESPASSERS CROSSING THE TRACKS AT GRADE CROSSINGS AND DECREASING STATIONARY EMISSIONS.

    Interchange · Crossing · Signal

    Source →
  • CRISI FY2023 · VA

    THIS PROJECT UPGRADES THE BUCKINGHAM BRANCH RAILROAD (BBRR) MAIN LINE AS WELL AS OTHER RAILCORRIDOR IMPROVEMENTS. THE UPGRADES AND IMPROVEMENTS WILL ENABLE BBRR TO INCREASE THE USEFUL LIFEOF ITS RAIL UP TO 50 YEARS WITH THE INSTALLATION OF CONTINUOUS WELDED RAIL (CWR), IMPROVE RIDE QUALITY FOR AMTRAKS CARDINAL SERVICE OVER CWR SEGMENTS AND 14 UPGRADED HIGHWAY-RAIL CROSSINGS, CREATE MORERELIABLE SIGNAL COMMUNICATIONS AND ELIMINATE SIGNAL BOND WIRE MAINTENANCE BY ELIMINATING JOINTED RAILSEGMENTS, INCREASE SAFETY AND REDUCE THE RISK OF FAILURE WITH FIVE BRIDGE RE-DECKING PROJECTS, MITIGATERELIABILITY AND SAFETY CONCERNS IN AFTON TUNNEL WITH TIE REPLACEMENTS AND ICE REDUCTION PREVENTIONIMPROVEMENTS, AND REMOVE PLATE F CLEARANCE RESTRICTIONS IN MILLBORO TUNNEL AND LICK RUN TUNNEL TOOPEN CAPACIT

    Cwr · Crossing · Signal · Bridge

    Source →
  • KANSAS DEPARTMENT OF TRANSPORTATION

    $11.0M

    CRISI FY2023 · KS

    THE PROPOSED PROJECT WOULD MAKE A SERIES OF IMPROVEMENTS ON THE CIMARRON VALLEY RAILROAD (CVR) IN SOUTHWESTERN KANSAS ALONG THE ROW FROM DODGE CITY TO HUGOTON, KANSAS. THE PROJECT WOULD REPLACE 51,618 CROSSTIES, PERFORM 3,577 FLASH-BUTT WELDS TO RAIL, RELAY 3.7 MILES OF RAIL IN CURVES, APPLY NEW BALLAST TO 67 MILES OF TRACK, AND SURFACE 85 MILES OF TRACK. THESE IMPROVEMENTS WILL ENABLE THE RAIL TO SUPPORT BIODIESEL TRANSPORT OPERATIONS AS WELL AS LOCAL AGRICULTURAL PRODUCTS, RAISE THE ALLOWABLE SPEED FROM 1O MPH TO 25 MPH, AND INCREASE THE WEIGHT CAPACITY.

    Track Rehabilitation · Class Upgrade · Cwr

    Source →
  • CRISI FY2023 · IL

    THE PROJECT REPLACES TWO EXISTING NORFOLK SOUTHERN RAILWAY (NSRR) STRUCTURES WITH FOUR NEWSTRUCTURES EACH DESIGNED FOR TWO TRACKS. TWO STRUCTURES WILL BE USED BY NSRR UPON PROJECTCOMPLETION. THE OTHER TWO STRUCTURES WILL BE USED IN THE FUTURE AFTER UPRR AND AMTRAKRELOCATE TO THE 10TH ST CORRIDOR. THIS RELOCATION IS EXPECTED TO OCCUR BY DECEMBER 31, 2025PER THE INTERGOVERNMENTAL COOPERATION AGREEMENT BETWEEN THE ILLINOIS DEPARTMENT OFTRANSPORTATION, CITY OF SPRINGFIELD, AND SANGAMON COUNTY DATED AUGUST 6, 2020.THE PROJECT INCLUDES UTILITY RELOCATION, NS FORCE ACCOUNT WORK, AND GRADING IN THE PROJECT AREA.

    Bridge Replacement

    Source →
  • CRISI FY2023 · WA

    THE PURPOSE OF THIS AWARD IS TO COMPLETE CONCEPTUAL ENGINEERING, PRELIMINARY ENGINEERING, AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS NEEDED TO ADDRESS INFRASTRUCTURE CONSTRAINTS ALONG THE FEDERALLY DESIGNATED PACIFIC NORTHWEST HIGH-SPEED RAIL CORRIDOR BETWEEN TR JUNCTION IN TACOMA, WASHINGTON AND DUPONT, WASHINGTON. THE ACTIVITIES TO BE PERFORMED INCLUDE DESIGN WORK AND ENVIRONMENTAL REVIEW FOR DOUBLE-TRACKING APPROXIMATELY 12 MILES OF SINGLE MAINLINE TRACK SEGMENTS IN PIERCE COUNTY. THE EXPECTED OUTCOME OF DOUBLE TRACKING THE SINGLE-TRACK SEGMENTS IS A REDUCTION IN CHOKE POINTS IN THE RAIL SYSTEM WHICH HELPS PASSENGER RAIL, COMMUTER RAIL, AND FREIGHT RAIL SERVICE IMPROVE ON-TIME PERFORMANCE. ONCE CONSTRUCTED, THE PROJECT WILL SUPPORTEFFORTS TO INCREASE AMTRAK CAPACITY IN THE PACIF

    Planning · New Line

    Source →
  • NY-PFRAP FY2023 · New York

    Lift Wharf Deck and Rail enhancement project will upgrade rail and wharf deck infrastructure to meet the increasing needs of heavier cargo at the Port

    Port/Freight Rail Infrastructure

    Source →
  • KANSAS DEPARTMENT OF TRANSPORTATION

    $9.4M

    CRISI FY2023 · KS

    THE PROPOSED PROJECT FUNDS THE KANSAS DEPARTMENT OF TRANSPORTATION (KDOT OR THE GRANTEE) TO REPLACE APPROXIMATELY 23.5 MILES (MP 490.7 TO 514.20) OF EXISTING OBSOLETE 85 LB. SECTIONAL RAIL WITH 115 LB. CONTINUOUS WELDED RAIL (CWR) ON THE KYLE RAILROAD CONCORDIA SUBDIVISION BETWEEN BELOIT AND YUMA JUNCTION, KANSAS (THE PROJECT). THE PROJECT WILL ALSO REPLACE 7 MAINLINE TURNOUTS, NEW 115 LB. RAIL CROSSING IN BELOIT, REBUILD THREE PUBLIC GRADE CROSSINGS WITH CONCRETE SURFACES, INCLUDING UNDERLYING CROSSTIE REPLACEMENT, AND REBUILD 46 PUBLIC AND PRIVATE GRADE CROSSINGS WITH TIMBER PLANK SURFACES, INCLUDING UNDERLYING CROSSTIE REPLACEMENT. THE PROJECT WILL INCLUDE SURFACE ALIGNMENT AND DRESS TO COMPLETE THE RESURFACING OF THE BALLAST PROFILE FOR PROPER DRAINAGE. THE OBJECTIVE OF THE PROJECT IS

    Cwr · Crossing · Track Rehabilitation

    Source →
  • CRISI FY2023 · IN

    THE OBJECTIVE OF THE PROJECT IS TO REHABILITATE THE CFE MAIN LINE AND DECATUR SUBDIVISION RAIL LINES TO ADDRESS CONDITIONS THAT HAVE RESULTED IN SLOW ORDERS, OPERATING SPEED RESTRICTIONS AND DERAILMENTS. THE CFE MAIN LINE HAS SIGNIFICANT DEFECTS WHICH RESULT IN SLOW ORDERS. THE DECATUR SUBDIVISION HAS SHOWN NUMEROUS RAIL FLAWS, GEOMETRY DEFECTS, AND INTERNAL DEFECTS IN RECENT YEARS. THE DECATUR SUBDIVISION IS EXCEPTED TRACK WHICH HAS DETERIORATED TO THE POINT OF OPERATING SPEED LIMIT OF 10 MILES PER HOUR. TWENTY-NINE DERAILMENTS OCCURRED IN THE PROJECT AREA BETWEEN 2013 AND 2021. THE PROPOSED PROJECT INCLUDES REPLACING EXISTING RAIL INFRASTRUCTURE BETWEEN WARSAW AND ETNA GREEN, INDIANA. THE PROJECT INCLUDES UPGRADING A 54.01-MILE SEGMENT (WHICH INCLUDES CONTINUOUS UPGRADES FROM MP 314.5 TO

    Track Rehabilitation

    Source →
  • CRISI FY2023 · FL

    THE OBJECTIVE OF THIS PROJECT IS TO IMPROVE THE EFFICIENCY, SAFETY, AND CAPACITY OF THE GRANTEES FGA 348-MILE MAINLINE TO MEET CURRENT AND FUTURE FREIGHT DEMAND IN NORTH FLORIDA. THROUGH THE IMPROVEMENTS IN THIS PROJECT, THE GRANTEE WILL REHABILITATE APPROXIMATELY 120 MILES OF TRACK TO COMPLETE THE RESTORATION OF 240 MILES OF THE FGA MAINLINE TO FRA CLASS III STANDARDS SUPPORTING 40 MPH FREIGHT OPERATIONS. THE GRANTEE WILL ALSO REHABILITATE ELEVEN SIDINGS AND MULTIPLE GRADE CROSSINGS UNDER THIS PROJECT TO IMPROVE THE EFFICIENCY AND SAFETY OF THE ENTIRE 348-MILE MAINLINE BETWEEN PENSACOLA AND BALDWIN, FL.

    Track Rehabilitation · Class Upgrade · Siding · Crossing

    Source →
  • CRISI FY2023 · GA

    THIS GRANT WILL FUND THE PREPARATION OF A SERVICE DEVELOPMENT PLAN (SDP) AND ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR THE ATLANTA TO SAVANNAH CORRIDOR IN PARTNERSHIP WITH FRA. THE MAIN OBJECTIVES OF AN SDP ARE TO IDENTIFY THE DRAFT PURPOSE AND NEED FOR INTERCITY PASSENGER RAIL DEVELOPMENT INCORPORATE AN ANALYSIS OF ALTERNATIVES SUPPORTED BY TECHNICAL TRANSPORTATION PLANNING AND CONCEPTUAL ENGINEERING INCORPORATE A HIGH-LEVEL ANALYSIS AND CONSIDERATION OF ENVIRONMENTAL FACTORS ASSOCIATED WITH THE ALTERNATIVES INCLUDE INPUT PROVIDED THROUGH PUBLIC INVOLVEMENT AND RELEVANT PUBLIC AGENCIES AND IDENTIFY THE GOVERNANCE STRUCTURE FOR THE IMPLEMENTATION AND OPERATION OF THE CORRIDOR.THE SDP RESULTS IN THE IDENTIFICATION OF A CORRIDOR PROJECT INVENTORY NECESSARY TO ACHIEVE THE PROPOSED SERVICE

    Planning · Passenger Rail

    Source →
  • CRISI FY2023

    THIS AGREEMENT FUNDS THE GRANTEE, NATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK), TO CONDUCT WORKFORCE DEVELOPMENT AND TRAINING ACTIVITIES AS PART OF THEMECHANICAL CRAFT WORKFORCE DEVELOPMENT APPRENTICESHIP TRAINING PROGRAM (THE PROJECT OR MECHANICAL APPRENTICESHIP PROGRAM). GRANTEE IS WORKING IN COOPERATION WITH GRANTEES LABOR ORGANIZATIONS AND GRANTEES MECHANICAL DEPARTMENT TO IMPLEMENT A THREE-YEAR MECHANICAL APPRENTICESHIP PROGRAM THAT WILL ATTRACT NEW EMPLOYEES AND PROVIDE UPWARD MOBILITY FOR CURRENT EMPLOYEES. AMTRAK REQUIRES A SKILLED MECHANICAL WORKFORCE (I.E., ELECTRICIANS, MACHINISTS, CAR REPAIRMEN, PIPEFITTERS, BOILERMAKERS, UTILITY WORKERS) TO MAINTAIN ITS FLEET OF EQUIPMENT. THE MECHANICAL APPRENTICESHIP PROGRAM WILL IMPLEMENT A PROGRAM THAT WILL PROVIDE THE OPPORTUNITY FOR

    Workforce

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    construct the Berks Waste and Rail Transfer Station which includes rail infrastructure and loading equipment

    Rail Freight Infrastructure

    Source →
  • CRISI FY2023 · ND

    BRINGS A 14.5-MILE SEGMENT OF RED RIVER VALLEY & WESTERN RAILROAD 3RD SUBDIVISION UP TO FRA CLASS 2 TRACK CLASSIFICATION, REPLACING JOINTED RAIL WITH 115-LB CWR BETWEEN INDEPENDENCE AND OAKES, NORTH DAKOTA.

    Class Upgrade · Cwr

    Source →
  • CRISI FY2023 · GA

    ENHANCE SAFETY ON LINE FROM MP 713 TO MP 662 TO ACCOMMODATE 286,000-LB CARLOADS AND CLASS 2 TRACK STANDARDS, INCLUDING 25 MPH OPERATING SPEEDS, PLUS AN UPGRADE AT MP 610.5.

    286k · Class Upgrade

    Source →
  • NY-PFRAP FY2023 · New York

    the installation of curve patch rail with ties and ballast/surfacing to improved safety of the corridor

    Port/Freight Rail Infrastructure

    Source →
  • CSX

    $5.5M

    NY-PFRAP FY2023 · New York

    to help mitigate congestion and increase capacity along the Fremont Industrial track. This project will enhance rail capacity, alleviate congestion related delays and optimize freight operations between Oak Point and Fresh Pond Yards

    Port/Freight Rail Infrastructure

    Source →
  • CRISI FY2023 · MS

    FUNDS THE CITY OF HATTIESBURG, MISSISSIPPI TO COMPLETE FINAL DESIGN AND CONSTRUCTION OF THE HALL AVENUE EAST IMPROVEMENTS (INCLUDING A ROAD OVERPASS OVER CN'S RAIL LINE), A RAIL SPUR, AND DYNAMIC MESSAGE SIGNS.

    Grade Sep · Spur

    Source →
  • NY-PFRAP FY2023 · New York

    installation of 286k rail into the Port for increase capacity and safety

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    reduced locomotive emissions plan for South Buffalo Railway. This project will meet EPA Tier 1 or better

    Port/Freight Rail Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Intermodal Facility Upgrades

    Freight Rail

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate rail infrastructure on the loop track and construct 20 unloading car spots

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the construction of a transload warehouse in Utica for the reduction of truck loads

    Port/Freight Rail Infrastructure

    Source →
  • CRISI FY2023 · CA

    MULTI-UNIVERSITY CONSORTIUM (C-STTAR) TO ESTABLISH A CLIMATE CHANGE AND EXTREME EVENTS TRAINING AND RESEARCH (CCEETR) PROGRAM TO IMPROVE THE RAIL NETWORK'S SAFETY AND RESILIENCE AGAINST EXTREME EVENTS.

    Research · Resilience

    Source →
  • CRISI FY2023 · NE

    INSTALLATION OF APPROXIMATELY 41,700 CROSS TIES, SURFACE AND DRESS APPROXIMATELY 562,848 TRACK FEET TO CONFORM TO FRA CLASS 3 TRACK STANDARD, AND REPLACEMENT OF 21 GRADE CROSSING SURFACES.

    Track Rehabilitation · Class Upgrade · Crossing

    Source →
  • NY-PFRAP FY2023 · New York

    the Patriot Corridor Safety Enhancement Project which includes replacement of rail, elimination of joints and other major rail safety components

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    construct three yard tracks at Verona Yard using repurposed rail from the Brilliant Branch

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    operation and safety improvement along the Rochester & Southern main line to a state of good repair. This will improve track capacity and fluidity at the P&L junction to reduce fuel consumption and improve public safety

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    Watkins Glen Grade Crossings and Bridge Rehabilitation Projects. This will upgrade the rail line to be able to support the industry standard rail cars along the line and improve safety at railroad crossings

    Port/Freight Rail Infrastructure

    Source →
  • CSX

    $3.9M

    NY-PFRAP FY2023 · New York

    Vertical Clearance Improvement and Safety Enhancement Project will remove five abandoned highway bridges along CSX rail lines throughout New York. These bridges pose safety risks, and their removal aligns with CSX standard clearance requirements

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the rehabilitation of bridge 196.63 Town of Chenango, Broome County. The bridge will be brought up to state of good repair for the continued safety of the corridor

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the rehabilitation of bridge 175.53, Village of Deposit, Delaware County. This will bring the bridge to state of good repair for continued safety

    Port/Freight Rail Infrastructure

    Source →
  • CRISI FY2023 · WA

    IMPROVE SAFETY, EFFICIENCY, AND RELIABILITY OF PASSENGER AND FREIGHT TRAFFIC ALONG THE PNWRC BY BUILDING THREE CATCHMENT WALLS TOTALING APPROXIMATELY 3,200 LINEAR FEET TO REDUCE LANDSLIDE RISK, PLUS AN IMPROVED ALERT SYSTEM.

    Resilience

    Source →
  • NY-PFRAP FY2023 · New York

    the rehabilitation of Bridge 272.17, Erie Blvd, Syracuse. This will bring the bridge to a good state of repair to continue to safely carry railcars in the City of Syracuse

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the improvements in the Eastman Business Park enhancing rail infrastructure to guarantee safe and reliable rail service

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate approximately 20 miles of track on the Cherry Tree Subdivision and Cresson Subdivision with spot tie replacement and surfacing

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the purchase of a clean diesel emissions reduction locomotive

    Port/Freight Rail Infrastructure

    Source →
  • CRISI FY2023 · GA

    UPGRADE APPROXIMATELY NINE MILES OF TRACK BY REPLACING JOINTED RAIL, COMPLETING MULTI-YEAR EFFORTS TO UPGRADE THE GSWR LINE BETWEEN CUTHBERT AND LYNN TO ACCOMMODATE 286K 25MPH CLASS 2 TRACK STANDARDS.

    Cwr · 286k · Class Upgrade

    Source →
  • NY-PFRAP FY2023 · New York

    the construction of an additional storage track capacity, rail safety upgrades throughout and an upgraded unloading method for agricultural products

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    East Binghamton Yard Improvements

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the Novelis Oswego Rail project. This project will realign and reactivate access, including the purchase of two new railcar movers, to reduce truck traffic, potential crashes and reduce emissions

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    to replace 3.75 miles of jointed rail with continuous welded rail, new ties, and ballast/surfacing. This project adds on to past projects to continue to improve the safety and efficiency of the Syracuse mainline

    Port/Freight Rail Infrastructure

    Source →
  • CRISI FY2023

    AT-GRADE HIGHWAY RAIL CROSSING CONSOLIDATION PLAN COMPLETING IMPROVEMENTS AT 15 CROSSINGS, INCLUDING PERMANENT CLOSURE OF FOUR PUBLIC AT-GRADE CROSSINGS, ON BNSF S 19-MILE CHEROKEE SUBDIVISION.

    Crossing

    Source →
  • MI-M-REP FY2023 · Michigan

    Purchase Hopper Cars

    Freight Rail

    Source →
  • MI-M-REP FY2023 · Michigan

    Tie Replacement Project

    Freight Rail

    Source →
  • MI-M-REP FY2023 · Michigan

    Track Improvement Project

    Freight Rail

    Source →
  • NY-PFRAP FY2023 · New York

    Falls Branch track rehabilitation will improve the sidetracks serving the Bonduelle Brockport Facility and Lineage Logistics cold storage facility reducing truckloads and carbon footprint

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    a Clean Diesel Upgrade to at least EPA Tier 3 locomotive

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    construct nearly 1,700 feet of track, a turnout, and unloading dock for a new 360,000 square foot rail-served warehouse

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    replace approximately 15,000 ties in the classification and North Bessemer Yards

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the Arcade and Attica Rail Rehabilitation Safety, Capacity and Reliability Project completion. This project prevents the closure of this rail line and the local economy that relies on it

    Port/Freight Rail Infrastructure

    Source →
  • MI-FEDP FY2023 · Michigan

    Target Steel

    Freight Rail

    Source →
  • NY-PFRAP FY2023 · New York

    the rehabilitation of WNYP’s freight mainline from Allegany to Niobe for increased rail safety, to prevent speed restrictions and improve bridge integrity

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    DLWR Track Capacity Expansion of yard space and additional tracks to meet customers demand and to increase interchange capacity

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    to upgrade to a more efficient and smaller carbon footprint of an Electric Railcar Mover. This is zero emission technology supporting NY’s green energy and electric policies

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the installation of ties, ballast & surfacing in Sullivan County to improve safety and reliability of the track

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate 860 feet of track and construct 3,500 feet of track in the Iron Hill Transload Yard

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Rail Rehabilitation

    Freight Rail

    Source →
  • CRISI FY2023 · MA

    COMPLETE PRELIMINARY ENGINEERING AND NEPA DOCUMENTATION FOR TRACK, SIGNAL, AND INFRASTRUCTURE IMPROVEMENTS IN THE SPRINGFIELD AREA TO BENEFIT AMTRAK'S VERMONTER, VALLEY FLYER, AND LAKE SHORE LIMITED SERVICES.

    Planning · Signal

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate approximately 11 miles of track on the Arden Subdivision by replacing rails, ties, and track surfacing

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the rehabilitation fo the Corning Secondary Infrastructure. This project will continue preservation and achieve a state of good repair

    Port/Freight Rail Infrastructure

    Source →
  • WSOR

    $1.6M

    WI-COMBINED FY2023 · Wisconsin · 10% match

    Replace bridge B-298

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate track in the Lincoln Yard with rail and tie replacement and track surfacing

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Tie Replacement & New Transload Construction

    Freight Rail

    Source →
  • NY-PFRAP FY2023 · New York

    Fleet enhancement and modernization to meet with FRA regulations

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    engine house construction for an all-weather maintenance facility with connecting track

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    track rehabilitation reconnecting current business and a transload facility for rural business and farmers to help more efficiently carry products and supplies reducing truck loads

    Port/Freight Rail Infrastructure

    Source →
  • WI-FRIIP FY2023 · Wisconsin · 0% match

    Install conveyance equipment

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2023 · MS

    ENVIRONMENTAL REVIEW AND ENGINEERING DESIGN FOR THE MS HIGHWAY 18 - KANSAS CITY SOUTHERN (KCS) GRADE SEPARATED ROAD OVERPASS BRIDGE, PARTNERING WITH KCS AND MDOT.

    Grade Sep · Planning

    Source →
  • NY-PFRAP FY2023 · New York

    Industrial track access improvements to better serve customers

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate approximately 11 miles of track by replacing ties and track surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate multiple tracks by replacing ties and rail to improve safety and efficiency on the Steelton & Highspire Railroad

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    to reactivate the Frazer and Jones track to provide rail service to a specialty casting manufacture and reduce truck loads and emissions

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate tracks and a rail scale in the Ritchey Yard

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the construction of a rail-to- truck bulk distribution facility which will help reduce truck loads and emissions

    Port/Freight Rail Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the Newton Falls Branch Bridge and culvert improvements to restore the line to service

    Port/Freight Rail Infrastructure

    Source →
  • MI-FEDP FY2023 · Michigan

    Freight Rail

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate 3 bridges and a culvert on the Pocono Mainline

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    Monofax track expansion and rehabilitation. This project will increase efficiency and reduced truck loads

    Port/Freight Rail Infrastructure

    Source →
  • MN-MRSI FY2023 · Minnesota

    Central Farms Service Delavan Facility Expansion

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate and replace rail on North Shore’s mainline

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate a rail siding, a rail scale and construct an unloading pit and additional track

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Connecting Railroad Bridge Repairs

    Freight Rail

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate a 440-foot-long tunnel to improve safety and operations

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the Utica shop facility completion

    Port/Freight Rail Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Track Improvement and Bridge Rehab

    Freight Rail

    Source →
  • NY-PFRAP FY2023 · New York

    the replacement of State Route 30 Grade Crossing for increase of safe operation of both rail cars and vehicles

    Port/Freight Rail Infrastructure

    Source →
  • MI-FEDP FY2023 · Michigan

    Freight Rail

    Source →
  • MI-M-REP FY2023 · Michigan

    Track Improvement Project

    Freight Rail

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate a rail siding and six at- grade crossings

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the installation of 12 new wayside detectors and to upgrade 6 detectors from Schenectady to Depew, New York

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate the Kerrtown Lead track by replacing rail and ties, surfacing, and improving three grade crossings

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate approximately 4 miles of track on the Lehigh Subdivision with spot tie replacement and surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate trackage at the sand transload facility

    Rail Freight Infrastructure

    Source →
  • NY-PFRAP FY2023 · New York

    the Basin Road rail terminal adjacent to the Ashokan Reservoir

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    construct a rail car storage track, turnout, and unloading pit at their Mount Holly Springs facility

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Tie Replacement & New Loadout Track

    Freight Rail

    Source →
  • MN-MRSI FY2023 · Minnesota

    Railcar Loading Modernization

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate a 1,200-foot storage trackage, extend an 800-foot siding, and install an at-grade trail crossing on the Octoraro Branch

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Rail Siding

    Freight Rail

    Source →
  • MN-MRSI FY2023 · Minnesota

    New Brighton Main Running Lead Rail Upgrade to 115lb

    Rail Service Improvement

    Source →
  • NY-PFRAP FY2023 · New York

    track capacity optimization

    Port/Freight Rail Infrastructure

    Source →
  • MN-MRSI FY2023 · Minnesota

    Rail Line Improvements to support economic development

    Rail Service Improvement

    Source →
  • MI-M-REP FY2023 · Michigan

    Track Improvement Project

    Freight Rail

    Source →
  • WI-FRIIP FY2023 · Wisconsin · 0% match

    Construct 520 feet of track

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate four facility tracks and turnouts

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Tie Replacement Project

    Freight Rail

    Source →
  • MN-MRSI FY2023 · Minnesota

    Rockville Line Improvement

    Rail Service Improvement

    Source →
  • MN-MRSI FY2023 · Minnesota

    Track Rehabilitation

    Rail Service Improvement

    Source →
  • MN-MRSI FY2023 · Minnesota

    Minnesota River Bridge Rehabilitation

    Rail Service Improvement

    Source →
  • NY-PFRAP FY2023 · New York

    track rehabilitation

    Port/Freight Rail Infrastructure

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate sections of track at the Gibsonton Terminal by replacing ties and surfacing

    Rail Freight Infrastructure

    Source →
  • MI-M-REP FY2023 · Michigan

    Equipment Upgrades

    Freight Rail

    Source →
  • CRISI FY2023 · WI

    ANALYZE PEDESTRIAN AND BICYCLIST MOVEMENT ACROSS CN/CP RAIL CORRIDOR SEGMENTS IN WAUKESHA AND WAUWATOSA TO DETERMINE ROOT CAUSES OF RAIL TRESPASS.

    Trespass · Research

    Source →
  • PA-COMBINED FY2023 · Pennsylvania

    rehabilitate siding trackage, relocate a rail scale, and stormwater management improvements

    Rail Freight Infrastructure

    Source →
  • Grand Elk

    $53,500

    MI-FEDP FY2023 · Michigan

    TekModo

    Freight Rail

    Source →
  • CRISI FY2022

    THE OBJECTIVE OF THE PROJECT IS TO ADD INTERCITY PASSENGER RAILSERVICE ON THE TCMC CORRIDOR THAT WILL INTEGRATE WITH THEEXISTING AMTRAK LONG-DISTANCE EMPIRE BUILDER SERVICE AND THEEXISTING INTERCITY HIAWATHA SERVICE.

    Passenger Rail

    Source →
  • CRISI FY2022

    THE PROJECT OBJECTIVE IS TO REHABILITATE THE BRIDGE TO A STATE OFGOOD REPAIR TO INCREASE EFFICIENCY OF FREIGHT AND PASSENGER RAILOPERATIONS OF THE REGIONAL AND NATIONAL RAIL NETWORK AND REDUCEOPERATIONS AND MAINTENANCE COSTS

    Bridge

    Source →
  • CRISI FY2022 · IL

    THE OBJECTIVE OF THE PROJECT IS TO INCREASE FREIGHT CAPACITY AND OPERATING WINDOWSAND REDUCE FREIGHT TRAIN CAUSED DELAYS AND TRACK CONFLICTS FOR INTERCITY AMTRAKPASSENGER SERVICE AT THE DOLTON JUNCTION INTERLOCKING. TO ACCOMPLISH THEOBJECTIVE, ILLINOIS DEPARTMENT OF TRANSPORTATION, IN COOPERATION WITH CSX, WILLCONSTRUCT RAIL IMPROVEMENTS INCLUDING ADDING NEW OR RENEWING EXISTING RAILROADTRACK, REPROFILING EXISTING TRACK, AND INSTALLING NEW TURNOUTS TO RECONFIGURE THEDOLTON JUNCTION INTERLOCKING. THE PROJECT CONSISTS OF CONSTRUCTION.

    Interchange · Track Rehabilitation

    Source →
  • CRISI FY2022 · ME

    THE PROJECT WILL REHABILITATE AND MODERNIZE 75 MILES OF MAINLINE RAIL OF THE PAN AM RAILWAYS (PAR) IN CENTRAL MAINE, AND ENABLE PAR TO BETTER SERVE CUSTOMERS IN THIS REGION BY CREATING EFFICIENCIES AND SAFETY IMPROVEMENTS. THIS WILL INCLUDE RAIL REPLACEMENT, SIGNALING IMPROVEMENT, SWITCH REPLACEMENT AND CROSSING UPGRADES.

    Track Rehabilitation · Signal · Crossing

    Source →
  • CRISI FY2022 · FL

    THE OBJECTIVE OF THE PROJECT IS TO COMPLETE PRELIMINARY DESIGN FORTHE BRIGHTLINE PHASE III, TAMPA TO ORLANDO HIGH SPEED INTERCITYPASSENGER RAIL PROJECT, WHICH EXTENDS FOR 83 MILES FROM THEORLANDO INTERNATIONAL AIRPORT TO TAMPA, FL. COMPLETION OFPRELIMINARY DESIGN WILL SUPPORT BRIGHTLINE TO PROCEED WITH FUTUREFINAL DESIGN AND CONSTRUCTION OF THE PHASE III PROJECT.

    High Speed Rail · Planning

    Source →
  • CRISI FY2022 · MI

    THE PROJECT WILL COMPLETE PRELIMINARY ENGINEERING (INCLUDING TRESPASSING NEEDSASSESSMENT), FINAL DESIGN AND CONSTRUCTION FOR TRESPASSING PREVENTION RELATEDIMPROVEMENTS ALONG MDOT S MICHIGAN LINE BETWEEN DEARBORN AND KALAMAZOO(LINE). THE PROJECT WILL PREVENT TRESPASSING AT SEVERAL LOCATIONS IN THE CORRIDOR,PROTECT HIGH SPEED TRAIN OPERATIONS OF 90 MPH OR HIGHER, AND IMPROVE PEDESTRIANSAFETY AT EXISTING AT GRADE CROSSINGS. SPECIFIC LOCATION OF IMPROVEMENTS WILL BEAREAS WHERE TRESPASSING HAS RESULTED IN STRIKES OR NEAR MISSES IN THE PAST.

    Trespass

    Source →
  • CRISI FY2022

    THE PROJECT WILL INCREASE THE CAPACITY OF THE ENTIRE WNYPSYSTEM TO 286,000 LB (286K) CARLOAD CAPABILITIES WHILESUBSTANTIALLY INCREASING THE STATE OF GOOD REPAIR. THE PROJECTWILL PROLONG THE RAILROAD S LIFE, SERVICE RELIABILITY, AND PROVIDEINCREASED SAFETY.

    286k

    Source →
  • CRISI FY2022

    THE PROJECT WILL REPAIR, REHABILITATE, AND UPGRADE 11 BRIDGES BETWEEN BRANDON, SD, AND BIGELOW TOWNSHIP, MN SOUTH OF WORTHINGTON, MN TO 286,000 POUND LB CAPACITY RAIL REPAIR AND REOPEN 7 5 MILES OF TRACK BETWEEN BRANDON, SD AND VALLEY SPRINGS, SD AND CONSTRUCT A CONNECTING TRACK FOR THE ELLIS AND EASTERN COMPANY RAILROAD TO CROSS THE BNSF RAILWAY BNSF AT MANLEY JUNCTION IN MANLEY, MN THE OBJECTIVE OF PROJECT IS TO OPERATE AND MAINTAIN A RAILROAD THAT CONNECTS SIOUX FALLS, SD WITH WORTHINGTON, MN ,AND CAN SAFELY HANDLE 286,000 LB RAIL CARS THE REHABILITATED RAILROAD WILL ALLOW ELLIS AND EASTERN TO OFFER REDUCE TRANSPORTATION COSTS, AND FREIGHT TRAINS WILL BE ABLE TO SAFELY TRAVEL AT FASTER SPEEDS CARRYING HEAVIER FREIGHT LOADS

    Bridge · 286k · Track Rehabilitation

    Source →
  • CRISI FY2022 · VA

    THE PROJECT WILL ELIMINATE AN AT GRADE CROSSING IN THE CITY OF CHESAPEAKE, VA BY CONSTRUCTING A ROADWAY OVERPASS AT FREEMANAVENUE OVER THE NORFOLK AND PORTSMOUTH BELT LINE RAILROAD THE PROJECT WILL IMPROVE OVERALL RELIABILITY AND SAFETY OF THETRANSPORTATION SYSTEM AND CREATE A CONTINUOUS, UNIMPAIRED FLOW OF TRAFFIC ALONG FREEMAN AVENUE TO REDUCE VEHICULAR DELAYS TO AND FROM THE MONEY POINT INDUSTRIAL AREA WHILE THE RAILROAD IS IN USE ELIMINATE CONFLICTS BETWEEN ROADWAY AND RAIL TRAFFIC AND ENHANCE EMERGENCY RESPONSE FREEMAN AVENUE IS THE ONLY ROADWAY ACCESS TO THE MONEY POINT INDUSTRIAL AREA IMPROVE THE CONDITION OF THE EXISTING RAILWAY SYSTEM AND FACILITIES IN THE REGION DECREASE TRANSPORTATION COSTS BY REDUCING VEHICULAR AND TRAIN AND DELAY IMPROVE LONG TERM EFFICIENCY, RE

    Grade Sep

    Source →
  • CRISI FY2022

    THE OBJECTIVE OF THE PROJECT IS TO IMPROVE THE KRR AND MODERNIZE THE INFRASTRUCTURE TO CURRENT FREIGHT RAIL STANDARDS, ENHANCE FREIGHT OPERATIONS, AND IMPROVE SAFETY AND ECONOMIC VITALITY TO KRR AND ITS CUSTOMERS WITHIN ITS NETWORK IN TEXAS, ARKANSAS, AND OKLAHOMA.

    Source →
  • CRISI FY2022 · PA

    THE RAIL PULSE PROJECT WILL ESTABLISH AND OPERATIONALIZE A CENTRALIZED INFORMATION PLATFORM THAT COLLECTS, PROCESSES, AND DISTRIBUTES RAILCAR LOCATION, CONDITION, AND HEALTH INFORMATION.

    Data

    Source →
  • CRISI FY2022 · LA

    THE OBJECTIVE OF THE PROJECT IS TO GENERATE EFFICIENCIES TO IMPROVE THE GRANTEE S NETWORK SWITCHING AND RAILCAR STORAGE CAPACITY.

    Yard

    Source →
  • CRISI FY2022 · IA

    THE PROJECT IS INTENDED TO BRING THE 27.3 MILE SEGMENT OF IOWA NORTHERN RAILWAY COMPANY MAIN LINE TRACK TO FRA CLASS 3 OPERATION FROM CURRENT FRA CLASS 1 AND 2 OPERATIONS.

    Class Upgrade

    Source →
  • CRISI FY2022 · AR

    IMPROVE LRPA S OPERATIONS BY ADDING INFRASTRUCTURE (SIDINGS, TRACKS, AND AN ENGINE MAINTENANCE FACILITY) TO IMPROVE EFFICIENCY, RELIABILITY, AND SAFETY, ANTICIPATING NEW CUSTOMER DEMAND BEGINNING LATE 2023.

    Siding · Yard

    Source →
  • CRISI FY2022 · FL

    ELIMINATE A CHOKEPOINT BY CONSTRUCTING A 1.7 MILE SEGMENT OF SECOND TRACK NEAR KISSIMMEE, FLORIDA TO ENHANCE OPERATIONAL SAFETY AND ADD CAPACITY FOR SUNRAIL COMMUTER TRAINS AND CFRC S TENANT RAILROADS.

    New Line

    Source →
  • CRISI FY2022 · MS

    IMPROVE RAILROAD OPERATIONS AND SAFETY TO SUPPORT CUSTOMERS, CONSUMERS, AND EMPLOYEES BY FACILITATING COST EFFECTIVE FREIGHT MOVEMENT ON THE RAIL LINE.

    Source →
  • CRISI FY2022 · TX

    FACILITATE A RAIL CONNECTION TO THE UPRR MAINLINE WITH ADEQUATE CAPACITY TO CONVERT APPROXIMATELY 81 PERCENT OF TRUCK-BORNE FREIGHT THAT ACCESSES THE PORT TO RAIL, CONSTRUCTING FOUR NEW RAIL LINES AT PORT FREEPORT'S PARCEL 14.

    Port Rail · New Line

    Source →
  • CRISI FY2022

    WORKFORCE DEVELOPMENT PROJECT: DEVELOPMENT OF A RAILROAD ENGINEERING PROGRAM FOR IMPLEMENTATION AT MORGAN STATE UNIVERSITY, AN HBCU IN BALTIMORE, MARYLAND, AS A TEMPLATE FOR OTHER HBCUS.

    Workforce

    Source →
  • WSOR

    $4.3M

    WI-COMBINED FY2022 · Wisconsin · 10% match

    Rehabilitation of 22 miles of track

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $3.6M

    WI-COMBINED FY2022 · Wisconsin · 7.86% match

    Rehabilitate five bridges & one mile of track

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2022 · AR

    NEW SIDINGS (INTERCHANGE, KERLIN, PLANT) AND MAINLINE UPGRADE REPLACING EXISTING 75-LB RAIL WITH 112-LB OR BETTER RAIL OVER 8 TRACK MILES.

    Siding · Track Rehabilitation

    Source →
  • WSOR

    $3.4M

    WI-COMBINED FY2022 · Wisconsin · 10% match

    Replace bridges B-258, B-262, B-306, B-346

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2022 · Wisconsin · 20% match

    Replace bridge 259

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2022 · Wisconsin · 29.06% match

    Construct 6,900 feet of terminal track

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 24 miles of track with tie replacement and track surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    construct a 110-car capacity loop track and unloading equipment to provide new rail service to the feed mill

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2022 · Iowa

    Alta, Iowa, Soybean Crush Plant

    Targeted Job Creation

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 20 miles of track with new ties and upgrade radio control switches

    Rail Freight Infrastructure

    Source →
  • CAPITAL METROPOLITAN TRANSPORTATION AUTHORITY

    $2.3M

    CRISI FY2022 · TX

    REPLACE THE WALNUT CREEK BRIDGE TO IMPROVE RELIABILITY AND SAFETY ON CAPMETRO S RAILROAD, SERVED BY THE AUSTIN WESTERN RAILROAD.

    Bridge Replacement

    Source →
  • CRISI FY2022 · FL

    REDUCE ACCIDENTS AT HIGHWAY-RAIL GRADE CROSSINGS IN RURAL AREAS OF MARTIN AND PALM BEACH COUNTIES VIA NEW DYNAMIC ENVELOPE PAVEMENT MARKINGS AND ROADWAY/RAILROAD SURFACE REHABILITATION.

    Crossing

    Source →
  • CRISI FY2022 · SD

    BENEFICIARY: RAPID CITY, PIERRE AND EASTERN RAILROAD (RCP&E). INSTALLATION OF 136 LB CONTINUOUS WELDED RAIL, GRADE CROSSING SURFACING AT NINE CROSSINGS, AND TRACK/RIGHT-OF-WAY IMPROVEMENTS BETWEEN MP 530.0 AND MP 534.0.

    Cwr · Crossing

    Source →
  • CRISI FY2022 · OH

    IORY-OPERATED GREENFIELD LINE REHABILITATION REPLACING DEFECTIVE TIES (OVER 50% OF TIES IN THE PROJECT AREA) TO ELIMINATE SLOW ORDERS AND ALLOW FRA CLASS II SPEEDS.

    Track Rehabilitation · Class Upgrade

    Source →
  • CRISI FY2022 · TN

    THE CUMBERLAND RIVER BRIDGE REHABILITATION AND AUTOMATION PROJECT

    Bridge

    Source →
  • CRISI FY2022 · VT

    INCREASE RAIL RIGHT-OF-WAY CLEARANCE VIA ROCK/SLOPE STABILIZATION, CULVERT REPAIR, AND ROCKFALL DETECTION WARNING SYSTEMS ALONG AN 80-MILE CORRIDOR OF THE NECR LINE IN VERMONT.

    Resilience

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    construct approximately a 1,000 foot siding to provide new rail access

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2022 · Minnesota

    Marshall Starch Production Realignment

    Rail Service Improvement

    Source →
  • WSOR

    $1.8M

    WI-COMBINED FY2022 · Wisconsin · 10% match

    Rehabiltate bridges 300 and 310

    Freight Rail Infrastructure/Preservation

    Source →
  • IA-RRLGP FY2022 · Iowa

    CP Unit Train Expansion Phase 5

    Rail Network Improvement

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    construct new track to an engine house and rehabilitate tracks in Glenwood Yard

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2022 · Wisconsin · 0% match

    Install nine overhead bins, conveyance equipment

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2022 · MN

    REMOVE JOINTS IN APPROXIMATELY 12.2 MILES OF TRACK TO IMPROVE SAFETY, REDUCE DERAILMENT RISK, AND DECREASE MAINTENANCE COSTS.

    Cwr

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 23 miles of track with tie replacement and track surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate yard tracks and turnouts at the Melt Shop facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate tracks in the Lincoln Yard including 250 feet of new connecting track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    construct a 1,100-foot siding and unloading equipment to expand rail capacity

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2022 · Minnesota

    North Loop Modernization - Clure Public Marine Term.

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    reconstruct a rail siding with a rail scale to serve a metal recycling facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate 3 bridges and a culvert on the Carbondale line

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2022 · Iowa

    IceCap Cold Storage

    Targeted Job Creation

    Source →
  • CRISI FY2022 · GA

    UPGRADE CURRENT 85LB RAIL TO 132LB RAIL FROM MP 36.49 TO MP 40.40, INSTALL 22 PAIRS OF COMPROMISE JOINTS, AND ALIGN TRACK WITH TAMPING/REGULATING OF EXISTING BALLAST.

    Track Rehabilitation

    Source →
  • MN-MRSI FY2022 · Minnesota

    Railyard Expansion

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate track and re-align wye near Bellefonte Yard and replace a switch on the main line

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2022 · Iowa

    Floyd Valley Transload

    Targeted Job Creation

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate multiple areas of track within the Leetsdale Industrial Park

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 4.5 miles of track by replacing rails and ties and track surfacing

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2022 · Minnesota

    Eden Prairie Rail Access & Unloading/Loading Site

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate over 2 miles of track with tie replacement, switch replacement, and track surfacing

    Rail Freight Infrastructure

    Source →
  • Shale Rail

    $613,000

    PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 2,000 feet of track with tie replacement, rail replacement, and track surfacing

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2022 · Minnesota

    Rosemount Siding Extension

    Rail Service Improvement

    Source →
  • MN-MRSI FY2022 · Minnesota

    Flood Prevention Project

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate yard tracks and raise a section of track to improve transloading

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 2,000 feet of track and construct 500 feet of track to a transload facility

    Rail Freight Infrastructure

    Source →
  • CRISI FY2022 · CO

    DEVELOP A PRELIMINARY SERVICE DEVELOPMENT PLAN AND ALTERNATIVES ANALYSIS, INCLUDING RAIL MODELING, AS TECHNICAL PREREQUISITES FOR A FINANCIALLY/OPERATIONALLY FEASIBLE SERVICE.

    Planning

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 2.5 miles of track by replacing ties, replacing a switch, and improving a grade crossing

    Rail Freight Infrastructure

    Source →
  • IRG Erie

    $509,000

    PA-COMBINED FY2022 · Pennsylvania

    construct a rail siding to a new plastic recycling plant

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2022 · Minnesota

    Broadway Siding Rail Upgrade

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate approximately 1 mile of track including tie replacement and drainage improvements

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2022 · Minnesota

    Rail Spur

    Rail Service Improvement

    Source →
  • CRISI FY2022 · IN

    DEVELOP A GIS MOBILE APP FOR THE LOUISVILLE AND INDIANA RAILROAD COMPANY WITH SOFTWARE TO ASSIST WITH COMMUNICATION AND RESPONSE DURING RAILROAD INCIDENTS.

    Data

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate a rail siding and extend it by 300 feet to improve rail car capacity

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    construct a section of track to connect adjacent tracks

    Rail Freight Infrastructure

    Source →
  • CRISI FY2022 · FL

    LOCATE TRESPASSING HOT SPOTS, PROVIDE PUBLIC OUTREACH, AND LEVERAGE LOCAL LAW ENFORCEMENT TO COMBAT TRESPASSING ON THE CENTRAL FLORIDA RAIL CORRIDOR (SUNRAIL).

    Trespass

    Source →
  • CRISI FY2022 · OK

    OKLAHOMA CITY POLICE DEPARTMENT OVERTIME PATROLS IN HOTSPOTS ALONG RAILROAD RIGHTS OF WAY TO PREVENT TRESPASSING-RELATED INJURIES OR DEATH.

    Trespass

    Source →
  • CRISI FY2022 · TX

    RAILROAD TRESPASSING INITIATIVE: FOUR HOUSTON POLICE OFFICERS DEDICATE ONE EIGHT-HOUR OVERTIME SHIFT PER WEEK TO PATROLLING RAIL CORRIDORS FOR TRESPASSERS.

    Trespass

    Source →
  • CRISI FY2022 · NC

    RAIL TRESPASSING ENFORCEMENT ACTIVITIES CONSISTENT WITH FRA S NATIONAL STRATEGY TO PREVENT TRESPASSING ON RAILROAD PROPERTY, INCLUDING DIRECTED PATROLS ALONG A THREE-MILE RAILROAD CORRIDOR.

    Trespass

    Source →
  • CRISI FY2022 · CA

    OPERATION SAFE RAILS II: OVERTIME POLICE PATROLS ON AND NEAR RAILROAD PROPERTY HOT SPOTS TO REDUCE TRESPASSING AND FUND ANTI-THEFT PROGRAMS.

    Trespass

    Source →
  • PA-COMBINED FY2022 · Pennsylvania

    rehabilitate and re-align tracks to improve rail and truck access

    Rail Freight Infrastructure

    Source →
  • CRISI FY2022 · MA

    WORCESTER POLICE DEPARTMENT WEEKLY PATROLS FOR TRESPASSERS ON RAIL LINES FOR 26 WEEKS TO REDUCE TRESPASSING-RELATED INCIDENTS.

    Trespass

    Source →
  • CRISI FY2022 · FL

    RAIL TRESPASSING ENFORCEMENT ACTIVITIES CONSISTENT WITH FRA S NATIONAL STRATEGY TO PREVENT TRESPASSING ON RAILROAD PROPERTY IN BROWARD COUNTY.

    Trespass

    Source →
  • CRISI FY2022 · CA

    REDUCE TRESPASSING INCIDENTS ALONG THE ORANGE AND BNSF SAN BERNARDINO SUBDIVISIONS VIA ADDITIONAL SHERIFF S DEPUTIES CONDUCTING TRESPASSING ENFORCEMENT OPERATIONS.

    Trespass

    Source →
  • CRISI FY2022 · MT

    BILLINGS POLICE DEPARTMENT RAIL TRESPASSING ENFORCEMENT ACTIVITIES IN PARTNERSHIP WITH BNSF RAILWAY AND MONTANA RAIL LINK.

    Trespass

    Source →
  • IA-RRLGP FY2022 · Iowa

    Booneville North Transload Facility

    Rail Port Planning & Development

    Source →
  • CRISI FY2022 · OH

    RAIL TRESPASSING ENFORCEMENT ACTIVITIES CONSISTENT WITH FRA S NATIONAL STRATEGY TO PREVENT TRESPASSING ON RAILROAD PROPERTY.

    Trespass

    Source →
  • IA-RRLGP FY2022 · Iowa

    Pacific Junction South Industrial Park Transload Facility

    Rail Port Planning & Development

    Source →
  • CRISI FY2022 · FL

    JACKSONVILLE SHERIFF S OFFICE RAIL TRESPASSING ENFORCEMENT ACTIVITIES CONSISTENT WITH FRA S NATIONAL STRATEGY TO PREVENT TRESPASSING ON RAILROAD PROPERTY.

    Trespass

    Source →
  • CRISI FY2022 · ME

    IDENTIFY CRITICAL TRESPASSING LOCATIONS ON THE PAN AM AMTRAK RAILWAY USING GIS SPATIAL ANALYSIS AND DRONE TECHNOLOGY, AND DEVELOP ENFORCEMENT/EDUCATION COUNTERMEASURE STRATEGIES.

    Trespass · Data

    Source →
  • CRISI FY2022 · FL

    SUICIDE PREVENTION ACTIVITIES: PUBLIC EDUCATION AND OUTREACH CAMPAIGN FOR SUICIDE PREVENTION, CONSISTENT WITH FRA S NATIONAL STRATEGY TO PREVENT TRESPASSING ON RAILROAD PROPERTY.

    Trespass

    Source →
  • CRISI FY2022 · FL

    TAMPA POLICE DEPARTMENT S RAILROAD TRESPASSING ENFORCEMENT GRANT

    Trespass

    Source →
  • CRISI FY2022 · NY

    DEVELOP AND IMPLEMENT A SAFETY PROGRAM TO IMPROVE RAIL SAFETY, FUNDING LAW ENFORCEMENT WAGES FOR TRESPASS ENFORCEMENT PATROLS ON FOOT AND BY CAR.

    Trespass

    Source →
  • CRISI FY2022 · FL

    HOLLYWOOD POLICE DEPARTMENT RAIL TRESPASSING ENFORCEMENT ACTIVITIES PATROLLING THE AMTRAK/SOUTH FLORIDA REGIONAL TRANSIT AUTHORITY TRI-RAIL LINE.

    Trespass

    Source →
  • METROPOLITAN TRANSPORTATION AUTHORITY

    $50,500

    CRISI FY2022 · NY

    RAILROAD SUICIDE PREVENTION PROGRAM: LIRR PARTNERS WITH NYS OFFICE OF MENTAL HEALTH TO DEVELOP A CUSTOMIZED GATEKEEPERS TO HOPE SUICIDE INTERVENTION TRAINING PROGRAM FOR STATION PERSONNEL.

    Trespass

    Source →
  • CRISI FY2022 · MA

    FITCHBURG POLICE DEPARTMENT OVERTIME ENFORCEMENT ACTIVITIES ALONG THE RAILROAD CORRIDOR TO MITIGATE TRESPASSING INCIDENTS AND INJURIES.

    Trespass

    Source →
  • CRISI FY2022 · PA

    ENHANCED PROACTIVE POLICE PATROL OF RAILROAD ASSETS IN LOWER MAKEFIELD TOWNSHIP TO ADDRESS TRESPASS-RELATED SUICIDES AND CRIMINAL ACTS.

    Trespass

    Source →
  • CRISI FY2022 · CA

    FOUR OFFICERS AND ONE SERGEANT PATROL RAILWAYS AND RAIL CROSSINGS THROUGHOUT THE CITY OF RIVERSIDE AS PART OF THE TRESPASSER REDUCTION TASK FORCE.

    Trespass

    Source →
  • CRISI FY2022 · CA

    HANFORD POLICE DEPARTMENT, PARTNERED WITH BNSF OFFICERS, CONDUCTS 16 FOUR-HOUR ENFORCEMENT DETAILS TARGETING RAIL TRESPASSING AND HOMELESS ENCAMPMENTS NEAR THE RAILWAY.

    Trespass

    Source →
  • CRISI FY2022 · CA

    RELATED ACTION TO THE HANFORD RAIL TRESPASSING ENFORCEMENT DETAILS PARTNERED WITH BNSF POLICE.

    Trespass

    Source →
  • CRISI FY2022 · FL

    PALM BEACH COUNTY SHERIFF S OFFICE STRATEGY FOR REDUCING RAILROAD TRESPASSING IN THE CITY OF LAKE WORTH BEACH

    Trespass

    Source →
  • CRISI FY2022 · NY

    TOWN OF COEYMANS OFFICERS ON ATVS PATROL APPROXIMATELY 6 MILES OF RAILWAY TO PREVENT TRESPASSING ON RAIL PROPERTY NEAR THE FUTURE PORT OF COEYMANS.

    Trespass

    Source →
  • CRISI FY2021 · ME

    THE WELLS AREA IMPROVEMENT PROJECT WILL IMPROVE THE OPERATIONAL FLEXIBILITY IN THE PROJECT AREA, AND IN TURN ADD CAPACITY AND MITIGATE POTENTIAL FOR SCHEDULE DELAYS. IN 2016, NNEPRA DEVELOPED A DOWNEASTER CORRIDOR SERVICE DEVELOPMENT PLAN. ONE OF THE PRIMARY GOALS NOTED IN THE SERVICE DEVELOPMENT PLAN IS TO INCREASE THE FREQUENCY OF SERVICE BETWEEN PORTLAND AND BOSTON FROM THE CURRENT FIVE ROUND TRIPS TO SIX AND SUBSEQUENTLY SEVEN ROUND TRIPS USING A PHASED APPROACH. ADDITIONALLY, THE SERVICE DEVELOPMENT PLAN INCLUDES GOALS FOR REDUCING THE TRAVEL TIME BETWEEN BOSTON AND PORTLAND (AND SUBSEQUENTLY TO BRUNSWICK). THAT PLAN NOTED TWO POTENTIAL AREAS OF IMPROVEMENTS IN WELLS, MAINE THAT FACTOR IN TO MEETING THESE GOALS; EXTENDING THE EXISTING NO. 2 SIDING TRACK (APPROXIMATELY 11,000 LONG) THA

    Siding · Passenger Rail

    Source →
  • CRISI FY2021

    THE MERCHANTS BRIDGE REHABILITATION PROGRAM

    Bridge

    Source →
  • CRISI FY2021 · CA

    THE OBJECTIVE OF THE BURBANK CORRIDOR SPEED AND SAFETY IMPROVEMENTS IS TO IMPROVE TRAIN CONTROL SYSTEMS IN THE CONGESTED BURBANK TO LOS ANGELES SEGMENT, SHARED BY AMTRAK, METROLINK, AND UPRR, ENHANCE SAFETY AND TRAIN THROUGHPUT AT TWO METROLINK STATIONS AND CROSSINGS, AND IMPROVE RELIABILITY AND SAFETY BY REPLACING AGING TRACK AND STRUCTURES.

    Signal · Station · Crossing · Track Rehabilitation

    Source →
  • CRISI FY2021 · FL

    BOCA RATON STATION

    Station

    Source →
  • WSOR

    $13.2M

    WI-COMBINED FY2021 · Wisconsin · 10% match

    Merrimac Bridge rehab Phase 3

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace approximately 19 miles of rail, improving the track from jointed rail to continuous welded rail

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate their railroad bridge over Washington Avenue and remove inactive spur bridges along the 25th Street Viaduct, increasing safety and improving access

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · ID

    MAGIC VALLEY RAIL SAFETY & CAPACITY EXPANSION

    Source →
  • WSOR

    $5.7M

    WI-COMBINED FY2021 · Wisconsin · 10% match

    10.6 miles of rail replacement (CWR)

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2021

    LAKE COUNTY RAILROAD REHABILITATION

    Track Rehabilitation

    Source →
  • CRISI FY2021 · IA

    IANR EDUCATION AND TRAINING PROGRAM

    Workforce

    Source →
  • WSOR

    $5.0M

    WI-COMBINED FY2021 · Wisconsin · 10% match

    12.1 miles of rail replacement (CWR)

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2021 · OH

    CINCINNATI CONNECTIONS REVITALIZATION

    Source →
  • CRISI FY2021 · NH

    NEW HAMPSHIRE NORTHCOAST INFRASTRUCTURE PROJECT (MULTIPLE OPPORTUNITY ZONES)

    Source →
  • CRISI FY2021

    NAPOLEON, DEFIANCE & WESTERN CRITICAL SAFETY UPGRADE

    Safety Tech

    Source →
  • CRISI FY2021 · AK

    TRAIL RIVER BRIDGE REPLACEMENT

    Bridge Replacement

    Source →
  • CRISI FY2021

    LINKING LIMA

    Source →
  • CRISI FY2021 · SD

    D&I MAIN LINE RAIL REPLACEMENT AND CROSSING IMPROVEMENT PROJECT

    Track Rehabilitation · Crossing

    Source →
  • CRISI FY2021 · WA

    MEADOWDALE BEACH PARK RAILROAD BRIDGE

    Bridge

    Source →
  • CRISI FY2021 · CA

    LEVERAGING PTC TO INCREASE CAPACITY

    Ptc

    Source →
  • CRISI FY2021 · SD

    ELLIS AND EASTERN SIOUX FALLS AREA BRIDGES

    Bridge

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    improve the Cresson Subdivision and Clearfield Yard with spot tie and rail replacement and rehabilitate five at-grade crossings

    Rail Freight Infrastructure

    Source →
  • WSOR

    $2.9M

    WI-COMBINED FY2021 · Wisconsin · 8.33% match

    Rehabilitate and replace nine bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.7M

    WI-COMBINED FY2021 · Wisconsin · 10% match

    Replace bridges F-34, F-52 and F-82

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2021 · GA

    GEORGIA SOUTHWESTERN RAILROAD REHABILITATION PROJECT

    Track Rehabilitation

    Source →
  • CRISI FY2021 · MD

    FREIGHT RAIL CHESTERTOWN LINE: WORTON TRACK SAFETY PROJECT TO REHABILITATE TRACK PROVIDING A SAFER, MORE EFFICIENT BULK FREIGHT ALTERNATIVE TO TRUCKING ALONG THE CHESTERTOWN LINE IN KENT COUNTY.

    Track Rehabilitation

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate the nine-span 1930 Lanesboro Bridge, improving safety for freight trains as well as vehicles and pedestrians beneath the bridge

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · AR

    JONESBORO INDUSTRIAL LEAD PROJECT

    Spur

    Source →
  • CRISI FY2021 · OH

    IMPROVE SAFETY AND RELIABILITY BY ELIMINATING SLOW ORDERS AND UPGRADING TO FRA CLASS II TRACK STANDARDS.

    Track Rehabilitation · Class Upgrade

    Source →
  • CRISI FY2021 · TX

    HARWOOD INTERCHANGE IMPROVEMENT PROJECT: EXPAND CAPACITY BY CONSTRUCTING A NEW DOUBLE-ENDED SIDING ADJACENT TO THE MAIN TRACK WITH DUAL-TONE MULTI-FREQUENCY POWER-CONTROLLED SWITCHES.

    Siding · Interchange

    Source →
  • IA-RRLGP FY2021 · Iowa

    Project Peony

    Targeted Job Creation

    Source →
  • CRISI FY2021 · CO

    ANIMAS RIVER BRIDGE REPLACEMENT

    Bridge Replacement

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace approximately 5.5 miles of worn rail on curves to improve rail conditions and safety

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · MA

    PIONEER VALLEY BRIDGE STRIKE PREVENTION, REHABILITATION, AND SAFETY PROJECT

    Bridge

    Source →
  • WSOR

    $1.7M

    WI-COMBINED FY2021 · Wisconsin · 10% match

    Rehab bridge 368; replace bridges 341¼ and 363

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.6M

    WI-COMBINED FY2021 · Wisconsin · 10% match

    Replace bridges B-338½, B-344 and B- 344½

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2021 · SD

    BELLE FOURCHE INDUSTRIAL AND RAIL PARK

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate nine railroad bridges

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2021 · Iowa

    Railport Expansion and upgrades

    Rail Network Improvement

    Source →
  • WI-FRIIP FY2021 · Wisconsin · 0% match

    Install 150-ft grain bin

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace approximately 1,600 feet of track and construct a ½-mile siding to the Boyertown Foundry including rehabilitation of the 4th Ave bridge

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · WA

    ELMA JUNCTION SAFETY, CAPACITY AND EFFICIENCY PROJECT

    Interchange

    Source →
  • CRISI FY2021 · SD

    SISSETON MILBANK RAILROAD LAKE FARLEY BRIDGE REPLACEMENT

    Bridge Replacement

    Source →
  • CRISI FY2021 · NM

    SANTA TERESA, NEW MEXICO AT-GRADE SEPARATION

    Grade Sep

    Source →
  • CRISI FY2021 · OH

    ENHANCING SAFE AND EFFICIENT FREIGHT RAIL/BARGE MODAL CONNECTIONS PROJECT

    Intermodal

    Source →
  • IA-RRLGP FY2021 · Iowa

    Charles City Terminal

    Targeted Job Creation

    Source →
  • CRISI FY2021 · MA

    SUPPLEMENTAL SAFETY MEASURES AT SIX GRADE CROSSINGS TO ENHANCE SAFETY AND QUALITY OF LIFE FOR CHELSEA RESIDENTS.

    Crossing

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate approximately 11.5 miles of track between Lottsville and East Columbus

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2021 · Minnesota

    Carleton Rail Access 2021 Fergus Falls

    Rail Service Improvement

    Source →
  • MN-MRSI FY2021 · Minnesota

    Track and Rail Crossing

    Rail Service Improvement

    Source →
  • CRISI FY2021 · AK

    ANDERSON WHEEL IMPACT LOAD DETECTOR (WILD)

    Safety Tech

    Source →
  • CRISI FY2021 · OH

    YOUNGSTOWN & SOUTHEASTERN RAILROAD MAHONING VALLEY REVIVAL PROJECT

    New Line

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    build ¼-mile of new track with a turnout and replace ¼- mile of track and 2 turnouts

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate the Octoraro Branch by replacing approximately 7,000 ties, 1,100 feet of rail, and three mainline switches, as well as 10 miles of surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace approximately 5,000 ties and rehabilitate an at-grade crossing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace six turnouts on Bridge 60 on the Strawberry Hill rail line

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate 2 at-grade rail crossings, replace a turnout, and repair the Greer Tunnel

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2021 · Wisconsin · 0% match

    Construct 1938-ft rail spur

    Freight Rail Infrastructure/Preservation

    Source →
  • MN-MRSI FY2021 · Minnesota

    Rail Curve Crossing

    Rail Service Improvement

    Source →
  • Smart Sand

    $565,000

    PA-COMBINED FY2021 · Pennsylvania

    construct a new turnout and replace four mobile conveyors

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2021 · Iowa

    RR Expansion and upgrade

    Rail Network Improvement

    Source →
  • IA-RRLGP FY2021 · Iowa

    Clinton Connecting Track

    Targeted Job Creation

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace approximately 4,000 ties and one switch

    Rail Freight Infrastructure

    Source →
  • MN-MRSI FY2021 · Minnesota

    Spur connection to MN Prairie Line

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    install four turnouts, replace approximately 800 feet of rail and ties, and construction of 800 feet of new track

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · WA

    PNWRC ALTERNATIVES DEVELOPMENT

    Planning

    Source →
  • IA-RRLGP FY2021 · Iowa

    CP Unit Train Expansion

    Targeted Job Creation

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    construct approximately 500 feet of new track to their plant and rehabilitate 1,200 feet of track with new ties and ballast

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · OR

    PENINSULA JUNCTION RAIL IMPROVEMENTS

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate 10 miles of track at its Cambria Plant, including repairs to the loop track and runaround track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate 3 bridges with new deck ties and pier repairs

    Rail Freight Infrastructure

    Source →
  • ARKANSAS DEPARTMENT OF TRANSPORTATION

    $256,019

    CRISI FY2021 · AR

    ARDOT ON-SYSTEM GRADE CROSSING APPROACH IMPROVEMENTS: PAVEMENT MARKING AND SIGNS AT STATE AND US HIGHWAY AT-GRADE RAILROAD CROSSING APPROACHES.

    Crossing

    Source →
  • MN-MRSI FY2021 · Minnesota

    Grain Elevator Siding

    Rail Service Improvement

    Source →
  • CRISI FY2021 · TX

    IMPROVING SAFETY GRADE CROSSINGS USING UAV-CRP DATA ANALYSIS PROJECT

    Crossing · Data

    Source →
  • CRISI FY2021 · CA

    PEDESTRIAN & VEHICLE SAFETY ENHANCEMENTS TO THE INTERSECTION OF J-STREET & PROSPERITY AVE

    Crossing

    Source →
  • MN-MRSI FY2021 · Minnesota

    Bridge Repairs

    Rail Service Improvement

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate and extend their rail siding and construct an unloading pit with conveyor

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate their yard tracks and extend their siding by 150 feet

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate approximately 600 feet of track within the industrial park

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate its yard tracks with approximately 1,000 feet of 136-pound rail, ties, and surfacing

    Rail Freight Infrastructure

    Source →
  • CRISI FY2021 · AK

    WASILLA CONTROL POINT

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    rehabilitate approximately 10 miles of track with spot tie replacements and 1,000 tons of ballast

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2021 · Pennsylvania

    replace ties and rail on their siding and rehabilitate a small rail bridge

    Rail Freight Infrastructure

    Source →
  • IA-RRLGP FY2021 · Iowa

    Oskaloosa Industrial Park Transload Facility

    Rail Port Planning & Development

    Source →
  • CRISI FY2021 · MS

    CENTRAL MISSISSIPPI RURAL SAFETY AND RAIL IMPROVEMENT REVITALIZATION PROJECT

    Source →
  • CRISI FY2020 · DE

    IMPROVE RELIABILITY, SAFETY, AND EFFICIENCY BY UPGRADING DELMARVA CENTRAL'S MAIN LINE, NINE RAILROAD CROSSINGS, AND THREE RAIL MOVEABLE BRIDGES OVER

    Crossing · Bridge

    Source →
  • CRISI FY2020 · AK

    VITAL FUNCTIONS FOR PTC TO IMPROVE SAFETY AND VELOCITY

    Ptc

    Source →
  • CRISI FY2020 · CA

    UPSCALING KEY PTC ONBOARD AND WAYSIDE COMPONENTS

    Ptc

    Source →
  • CRISI FY2020 · SC

    SOUTH CAROLINA PIEDMONT FREIGHT RAIL SERVICE IMPROVEMENT PROGRAM

    Source →
  • CRISI FY2020 · TX

    DART/TRINITY METRO REGIONAL PTC DEPLOYMENT PROJECT

    Ptc

    Source →
  • CRISI FY2020 · MI

    MACKINAW SUBDIVISION INFRASTRUCTURE IMPROVEMENTS

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    lower tracks to permit routing of double-stack container and multi-level auto rack traffic to/from Port of Philadelphia

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · NE

    NCRC INFRASTRUCTURE IMPROVEMENTS PROJECT

    Source →
  • CRISI FY2020 · AL

    OLD HIGHWAY 20 GRADE SEPARATION

    Grade Sep

    Source →
  • CRISI FY2020 · CO

    SOUTHWEST CHIEF PTC PROJECT

    Ptc

    Source →
  • CRISI FY2020 · MI

    INFRASTRUCTURE ENHANCEMENT PROGRAM FOR LAKE STATE RAILWAY'S HURON SUBDIVISION

    Source →
  • CRISI FY2020 · MO

    REPLACEMENT OF THE MACARTHUR BRIDGE TRUSS OVER S. BROADWAY PROJECT

    Bridge Replacement

    Source →
  • CRISI FY2020 · IL

    CRAWFORD COUNTY (IL) RURAL RAILROAD BRIDGE PROJECT

    Bridge

    Source →
  • CAPITAL METROPOLITAN TRANSPORTATION AUTHORITY

    $6.0M

    CRISI FY2020 · TX

    CAPITAL METRO E-ATC PTC WAYSIDE INSTALLATION PROJECT

    Ptc

    Source →
  • CAPITAL METROPOLITAN TRANSPORTATION AUTHORITY

    $5.7M

    CRISI FY2020 · TX

    PTC INTEROPERABILITY AND TESTING PROJECT

    Ptc

    Source →
  • WSOR

    $5.5M

    WI-COMBINED FY2020 · Wisconsin · 10% match

    Rehabilitation of 25 miles of track

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $5.2M

    WI-COMBINED FY2020 · Wisconsin · 10% match

    12.5 miles of rail replacement (CWR)

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2020 · IA

    IOWA INTERSTATE CONTINUOUS WELDED RAIL UPGRADE

    Cwr

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace three thru truss bridges and rehabilitate two abutments on a thru-girder bridge

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · IL

    LENOX INTERLOCKING RECONFIGURATION

    Interchange

    Source →
  • CRISI FY2020 · IL

    POSITIVE TRAIN CONTROL (PTC) DEPLOYMENT AND INTEROPERABILITY TESTING PROJECT

    Ptc

    Source →
  • CRISI FY2020 · IN

    THE GRAHAM CREEK BRIDGE REPLACEMENT PROJECT

    Bridge Replacement

    Source →
  • CRISI FY2020 · GA

    CENTRAL GEORGIA RAIL CORRIDOR COMPETITIVENESS PROJECT

    Source →
  • CRISI FY2020 · IA

    MANLY SUBDIVISION - CONTINUOUS WELDED RAIL INSTALLATION PROJECT

    Cwr

    Source →
  • CRISI FY2020 · OH

    IMPROVING TRANSPORTATION IN SUPPORT OF THE AMERICAN STEEL INDUSTRY

    Source →
  • CRISI FY2020 · RI

    QUONSET FREIGHT RAIL ENHANCEMENTS AND EXPANSION (Q-FREE) FUNDING FOR MILL CREEK RAILYARD

    Yard

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 7,500 ties and 74,000 feet of rail on worn areas of its Cherry Tree and Cresson subdivisions

    Rail Freight Infrastructure

    Source →
  • WSOR

    $2.7M

    WI-COMBINED FY2020 · Wisconsin · 10% match

    Merrimac Bridge rehab Phase 2

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2020 · CA

    CALTRAIN PTC CONFIGURATION MANAGEMENT AND OFFICE SEGMENT FAILOVER

    Ptc

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    expand its rail infrastructure and construct four new tracks and install unloading equipment

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · KS

    RURAL RAILROAD SAFETY CENTER

    Research

    Source →
  • CRISI FY2020 · FL

    SOUTH FLORIDA EAST COAST RAIL CORRIDOR INTRUSION PREVENTION PROJECT

    Trespass

    Source →
  • CRISI FY2020 · AK

    GPS PRECISION UPGRADE FOR PTC

    Ptc

    Source →
  • WSOR

    $2.3M

    WI-COMBINED FY2020 · Wisconsin · 10% match

    2.8 miles of rail replacement (CWR)

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2020 · TX

    CHEMICAL HAZARD ELIMINATION, SAFETY, AND SECURITY (CHESS) IMPROVEMENT

    Safety Tech

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace 1.2 miles of jointed rail with CWR rail including the rehabilitation of seven turnouts and 10 public grade crossings

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · TN

    WEST TENNESSEE RAILROAD KENTON BRANCH REHABILITATION AND SAFETY IMPROVEMENT PROJECT

    Track Rehabilitation

    Source →
  • CRISI FY2020 · GA

    HEART OF GEORGIA RAILROAD UPGRADE PROJECT

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 2,600 ties and 3,315 feet of rail on its mainline and improve three at-grade crossings

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · AK

    FLAT CAR ACQUISITION PROJECT

    Equipment

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    construct a 3,900-foot siding to expand capacity and replace approximately 7,440 feet of rail and 1,550 ties

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · GA

    CHATTOOGA & CHICKAMAUGA RAILWAY REHABILITATION PROJECT

    Track Rehabilitation

    Source →
  • CRISI FY2020 · NY

    POSITIVE TRAIN CONTROL PROJECT FOR MIDDLETOWN AND NEW JERSEY RAILROAD L.L.C.

    Ptc

    Source →
  • CRISI FY2020 · WA

    PINES ROAD/BNSF GRADE SEPARATION PROJECT

    Grade Sep

    Source →
  • CRISI FY2020 · WA

    PNWRC RELIABILITY - LANDSLIDE MITIGATION PHASE II

    Resilience

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    repair the Port Perry Bridge by replacing the floor beams and bridge stringers

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    construct approximately 1,200ft of yard tracks at their Boyertown Transload Facility

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · AK

    GEOMETRY RAILCAR ACQUISITION

    Equipment

    Source →
  • CRISI FY2020 · AK

    FLAT CAR ELECTRIFICATION PROJECT

    Equipment

    Source →
  • CRISI FY2020 · FL

    PORT MANATEE RAILROAD TRACK REHABILITATION

    Track Rehabilitation · Port Rail

    Source →
  • CRISI FY2020 · SD

    SOUTH DAKOTA WEST RIVER RAIL IMPROVEMENT PROJECT

    Source →
  • CRISI FY2020 · MI

    BATTLE CREEK CONNECTION PROJECT

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 500 bridge ties and 700 feet of rail on the first phase of their low-grade bridge project

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 44,000 ft. of rail and 2,500 ties and surface the line to maintained 286,000 weight capacity and improve safety

    Rail Freight Infrastructure

    Source →
  • WSOR

    $546,858

    WI-COMBINED FY2020 · Wisconsin · 10% match

    Rehab bridges 226 & 272

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2020 · GA

    HEART OF GEORGIA - MIDVILLE REACTIVATION PROJECT

    New Line

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 4,900 rail ties

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    improve track conditions by replacing approximately 4,500 ties on the Wilmington Northern line and 2,000 ties on the Quakertown line

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · TX

    GRIGGS ROAD AND MYKAWA ROAD RAIL SAFETY IMPROVEMENTS

    Crossing

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 6,000 ties on its Stony Creek branch and Bethlehem branch

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · ND

    MINOT INTERMODAL FACILITY

    Intermodal

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace ties and raise, line, and surface its industrial park tracks

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    finish the work of phase II of the rehabilitation of approximately 1,550 feet of track on its West Park branch

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 1,500 ties and surface 5 miles of track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    construct a new 3,200-foot siding to expand its main line track capacity accommodating increased interchange traffic with CSX and NS railroads

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · TX

    DAYTON RAIL CROSSINGS IMPROVEMENT PROJECT

    Crossing

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    realign its tracks and replace a turnout to improve its operations and safety

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    rehabilitate approximately 10 miles of track from its Coleman Junction to the Cambria Plant

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    construct loading and unloading equipment and raise its track to accommodate the transload of materials

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · CO

    SOUTHWEST CHIEF THROUGH CAR ALTERNATIVES ANALYSIS

    Planning

    Source →
  • Dyer Quarry

    $192,150

    PA-COMBINED FY2020 · Pennsylvania

    expand the locomotive garage to store their locomotives and re-align the track connecting the garage

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    replace approximately 600 ties, two switches, and surface 800 feet of track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    extend a passing siding by 1,000 feet improving its operations

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2020 · Pennsylvania

    rehabilitate approximately 400 feet of track and build an unloading pit and conveyor to transload the agricultural products from rail to truck

    Rail Freight Infrastructure

    Source →
  • CRISI FY2020 · MA

    HIGH STREET AND CANAL STREET RAILROAD GRADE CROSSING IMPROVEMENT PROJECT

    Crossing

    Source →
  • CRISI FY2020 · FL

    NORTHEAST FLORIDA RURAL RAILYARD PROJECT

    Yard

    Source →
  • CRISI FY2020 · MD

    CANTON RAILROAD COMPANY SWITCH REPLACEMENT

    Track Rehabilitation

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    lower tracks under nine overhead obstructions to permit routing of double-stack container and multi-level auto rack traffic to/from Port of Philadelphia

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019

    NORTHERN INDIANA COMMUTER TRANSPORTATION DISTRICT (NICTD) POSITIVE TRAIN CONTROL IMPLEMENTATION

    Ptc

    Source →
  • WSOR

    $5.7M

    WI-COMBINED FY2019 · Wisconsin · 10% match

    15 miles of rail replacement with CWR

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2019 · CA

    SMART WINDSOR EXTENSION PTC IMPLEMENTATION

    Ptc

    Source →
  • WSOR

    $4.2M

    WI-COMBINED FY2019 · Wisconsin · 10% match

    7.5 miles of rail replacement with CWR

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2019 · IA

    BOONEVILLE BRIDGE PROJECT

    Bridge

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    replace 25 linear miles of rail and 4,800 ties and to construct a 4,000 ft. siding and two turnouts on its Cherry Tree Subdivision to support export metallurgical coal

    Rail Freight Infrastructure

    Source →
  • WI-FRPP FY2019 · Wisconsin · 20% match

    Rehabilitate and construct track at Intermodal Yard and West Yard

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2019 · MA

    IMPLEMENTATION OF A PTC SYSTEM ON HIGH-TRAFFIC CORRIDOR

    Ptc

    Source →
  • CRISI FY2019 · IN

    CHICAGO SOUTH SHORE & SOUTH BEND RAILROAD (CSS) RAIL REHABILITATION AND SAFETY IMPROVEMENT PROJECT

    Track Rehabilitation

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct two spur tracks and install unloading equipment at its manufacturing facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    repair a bridge located on a route utilized by three railroads in the Allegheny County region

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    rehabilitate approximately 2 miles of track, turnouts, and private crossings serving its rolling mill and electric melt shop sites

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · MN

    JOINT ELIMINATION - RAIL INFRASTRUCTURE AND SAFETY IMPROVEMENT

    Cwr

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct approximately 2 miles of new track to increase rail capacity

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · IA

    POSITIVE TRAIN CONTROL DEPLOYMENT FOR THE IOWA NORTHERN RAILWAY COMPANY

    Ptc

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    install new bridge timbers, walkways, and handrails as well as super-elevation correction involving three bridges

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · PA

    ONBOARD PTC EQUIPMENT

    Ptc

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct less than 1 mile of track by extending interchange track and constructing new bulk, ladder, and lead tracks to more than double current yard capacity

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019

    IOWA INTERSTATE POSITIVE TRAIN CONTROL UPGRADE

    Ptc

    Source →
  • CRISI FY2019 · UT

    PTC FRONTRUNNER SOUTH SEGMENT

    Ptc

    Source →
  • WI-FRIIP FY2019 · Wisconsin · 36.94% match

    Construct 1.2 M bushel grain bin

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2019 · IL

    NORTHERN ILLINOIS PTC (NIPTC) PROJECT

    Ptc

    Source →
  • CRISI FY2019

    SHORT LINE RAILROAD POSITIVE TRAIN CONTROL PROJECT

    Ptc

    Source →
  • WSOR

    $1.3M

    WI-COMBINED FY2019 · Wisconsin · 5% match

    Washout repairs

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.2M

    WI-COMBINED FY2019 · Wisconsin · 10% match

    Replace bridges A-492 & A-494

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    repair structural and drainage issues in State Tunnel to bring it into a state of good repair

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · NY

    NEW YORK & ATLANTIC RAILWAY PTC IMPLEMENTATION PROJECT

    Ptc

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    rehabilitate the transfer table pit retaining walls

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct 1,350 ft. of track and install three turnouts to develop a multi-purpose transload site

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · PA

    POSITIVE TRAIN CONTROL IMPLEMENTATION FOR A SAFER CENTRAL PA

    Ptc

    Source →
  • CRISI FY2019

    CHICAGO SOUTH SHORE & SOUTH BEND RAILROAD PTC IMPLEMENTATION PROJECT

    Ptc

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    rehabilitate approximately 1 mile of track in critical operations areas, including replacement of ties and switch timbers, new ballast, and surfacing

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    complete the final phase of a project to rehabilitate and construct approximately .5 miles of track and increase storage capacity

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct and rehabilitate less than .5 mile of track and install new transloading equipment to expand capacity at its Allegheny River barge/rail/truck transload site

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    complete various track upgrades to accommodate increased rail volume from USS’s new hot rolling mill in Braddock, PA

    Rail Freight Infrastructure

    Source →
  • WSOR

    $665,325

    WI-COMBINED FY2019 · Wisconsin · 16.98% match

    Replace bridges B-356 & B-368

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    replace a 50 ft. scale to accommodate 60 ft. rail cars and replace two No. 6 turnouts and 900 ft. of track

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · NE

    NCRC PTC SYSTEM COMPLIANCE PROJECT

    Ptc

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    replace 2,600 ties over 24 miles of railroad and install 0.60 miles of new rail on five key curves

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct approximately 0.30 miles of new track and one new turnout on URR’s East Pittsburgh viaduct serving USS’s new hot rolling mill

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    replace 3,515 ties and 218 bridge timbers and surface approximately 3 miles of track to increase storage capacity for rail-truck transload

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    replace deteriorated open deck bridge timbers on the McKees Rocks Bridge

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · NY

    NEW YORK AND ATLANTIC QUEENS TRACK REALIGNMENT AND REHABILITATION PROJECT

    Track Rehabilitation

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    replace 1,500 ties, surface 5 miles of track, and rehabilitate a culvert

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    rehabilitate approximately 0.5 mile of rail infrastructure and address drainage issues to support growth of rail-truck transload terminal

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    complete the final phase of rehabilitation project that will rebuild approximately 1.5 miles of track, resulting in more efficient rail operations and better access within the plant

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · PA

    BACK OFFICE SERVER

    Data

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    construct 1,600 of track for rail-truck transload facility for the distribution of crushed stone

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    rehabilitate 700 ft. of existing track to improve the efficiency of its inbound railcar unloading operations

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2019 · Pennsylvania

    upgrade 3 miles track to facilitate service to a new cement transload terminal

    Rail Freight Infrastructure

    Source →
  • CRISI FY2019 · AK

    TERMINAL WIRELESS COMMUNICATIONS PROJECT

    Source →
  • WSOR

    $131,426

    WI-COMBINED FY2019 · Wisconsin · 10% match

    Rehabilitate U-6½

    Freight Rail Infrastructure/Preservation

    Source →
  • CRISI FY2019 · MS

    ALL ABOARD THE SAFETY TRAIN PE/NEPA PROJECT

    Planning

    Source →
  • CRISI FY2019 · NC

    NCDOT ROLLING STOCK POSITIVE TRAIN CONTROL (PTC) COMMISSIONING

    Ptc

    Source →
  • AK-LEG-CAPEX FY2018 · AK · State Agency

    Approximately 50 miles of new highway north from Juneau (Cascade Point to north of the Katzehin River) plus a shuttle ferry connection, with $202M available as of 2014 ($154M federal, $48M state). The Walker-Mallott administration selected the "No Action" alternative on December 15, 2016; FHWA approved the Final Supplemental EIS and Record of Decision with No Action as the selected alternative on June 18, 2018. No highway was built.

    Highway · Ferry Connection

    Source →
  • WSOR

    $4.9M

    WI-COMBINED FY2018 · Wisconsin · 10% match

    Track rehab including CWR

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $4.7M

    WI-COMBINED FY2018 · Wisconsin · 10% match

    Replace bridge B-316

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2018 · Wisconsin · 20% match

    Rehabilitate 15 crossings

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 56 miles of track on the WBV subdivision, including the replacement of ties and bridge timbers and surfacing track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    expand rail facilities, construct new siding, and purchase unloading equipment

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct an additional track and purchase unloading equipment to receive product by rail

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 34 miles of track on the W&P subdivision by raising, lining, and resurfacing the track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate a railroad bridge, five turnouts, and more than one mile of track to increase yard operation efficiencies

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate and improve approximately 2.6 miles of track on the FM&P Subdivision by installing continuous welded rail and realigning and surfacing track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    improve the Radebaugh Subdivision, including rehabilitating

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate yard tracks at the Hollidaysburg Transload Facility and construct a new siding to serve existing and future businesses

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct an unloading pit, acquire unloading equipment, and rehabilitate nearly one mile of yard tracks

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    expand and rehabilitate yard tracks at their facility to increase capacity and support their new business line

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    acquire and install positive train control (PTC) equipment on four Pennsylvania Northeast Railroad locomotives

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate yard tracks at the Hollidaysburg Tank Car Shop by replacing ties, turnouts, and ballast to increase the yard’s capacity and efficiency

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 20 miles of track by replacing ties and rail

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 1.8 miles of track with continuous welded rail

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate and extend two yard tracks, construct a retaining wall, and purchase unloading equipment to increase rail service

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 3.5 miles of track by replacing ties and surfacing track

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 27 miles of track with new ties and rail on the Octoraro Line

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 0.25 miles of track and two at-grade crossings

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct approximately 0.5 miles of storage tracks to increase rail car capacity and efficiencies

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate a siding and switch to increase efficiency

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct a 500-foot double-ended side track to increase capacity and efficiency

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct a 1,700-foot siding and two turnouts to increase capacity and efficiency

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct an unloading pit and acquire unloading equipment to increase rail service at the facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct a side track to their facility to enable rail service

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately two miles of track on the Bristol Line and extend a rail siding by 1,000 feet

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    construct a new rail siding and unloading dock to enable new rail service

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2018 · Pennsylvania

    rehabilitate approximately 0.75 miles of track, including installing new ties, surfacing track, and constructing a 60-foot retaining wall

    Rail Freight Infrastructure

    Source →
  • WSOR

    $8.0M

    WI-COMBINED FY2017 · Wisconsin · 10% match

    Phase 2 includes installation of ties and renewing crossings and turnouts

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $4.4M

    WI-COMBINED FY2017 · Wisconsin · 10% match

    Rail replacement (CWR)

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about 36 miles of track including rail, ties, ballast, and track surfacing on the Clearfield Cluster's Cherry Tree, Cresson, and Wallaceton subdivisions to improve the efficiency of operations and safety

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    realign Norfolk Southern's track in Middletown, which will provide greater clearances for rail freight trains and reduce track curvature

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    construct 10 miles of track from Aliquippa to Monaca, PA to transport construction materials for Shell's plant and outbound product from the completed plant, which will improve the efficiency of operations and safety

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2017 · Wisconsin · 0% match

    Installation of 6,149 feet of new spur trackage and relocation of other track.

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate nearly 10 miles of the P&W subdivision from Bakerstown to Glenwood Yard, including replacing continuous welded rail and surfacing track to maintain safe rail operations

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate 18 railroad bridges on Wheeling & Lake Erie Railway Company's Pittsburgh and Rook Subdivisions including structural and bridge deck

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2017 · Wisconsin · 0% match

    Construct rail spur tracks, switches and unloading conveyor system

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about 20 miles of track between Brookville and Falls Creek, facilitating continued freight rail service to Brookville Equipment Corp

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate approximately four miles of track, including the replacement of 10 turnouts, five crossings, and track surfacing to facilitate the safe movement of raw materials and finished steel products

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    replace and surface three miles of track with continuous welded rail from Broadford to the Fayette County line to improve safety and operations

    Rail Freight Infrastructure

    Source →
  • WI-FRIIP FY2017 · Wisconsin · 0% match

    Installation of spur tracks, conveying

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate approximately three miles of track from Radebaugh to South Greensburg by replacing jointed rail with continuous welded rail, that will improve the replacement of existing rail and steel components on the Radebaugh subdivision

    Rail Freight Infrastructure

    Source →
  • WSOR

    $1.4M

    WI-COMBINED FY2017 · Wisconsin · 10% match

    Bridge rehab/replacement of 254 & 262

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $996,960

    WI-COMBINED FY2017 · Wisconsin · 10% match

    Bridge rehab/replacement

    Freight Rail Infrastructure/Preservation

    Source →
  • LCT Energy

    $700,000

    PA-COMBINED FY2017 · Pennsylvania

    construct about three miles of track from Norfolk Southern's interchange to LCT Energy's Laurel Plant, including an at-grade crossing, which will enable the plant to resume operation

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate .25 mile of track from Delaware-Lackawanna's line to Scranton Transload's facility including the replacement of 2 turnouts and surfacing of track which will allow for materials to be transported to the facility by rail instead of truck

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    construct approximately one mile of track, two turnouts, and an at-grade crossing in a Philadelphia industrial park to provide new rail service to Phoenix Lithographing Corp

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about one mile of track in the West Mifflin plant yard as part of a 4-phased project, including replacing turnouts and ties, track surfacing, and track realignment to increase efficiency of yard operations

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate approximately seven miles of track between Concord and Union City, including the replacement of ties and rail, track surfacing, and repairing an at-grade crossing, which will improve safety

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate 19 miles of the Carbondale Line and construct a 1,000-foot yard track, including ties, track surfacing, and bridge repairs which will improve operations and yard capacity

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate 12 miles of track on the Lancaster Northern line and 11 miles of track on the Quakertown line, including ties and track surfacing to maintain safe operations

    Rail Freight Infrastructure

    Source →
  • WRRTC

    $535,472

    WI-COMBINED FY2017 · Wisconsin · 49.27% match

    Track removal & bridge stabilization

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    Rehabilitate approximately 700 feet of track and replace 4 turnouts at Arcelor Mittal Plate's Coatesville plant, including track re-alignment to support the movement of industry standard rail cars

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about four miles of track, including the replacement of ties, timbers, and turnouts in the River Interchange Yard to improve interchange operations

    Rail Freight Infrastructure

    Source →
  • Corsa Coal

    $345,861

    PA-COMBINED FY2017 · Pennsylvania

    rehabilitate 10 miles of track from the CSX interchange to the Cambria Branch Plant in Berlin, to improve track condition and safe operations

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about three miles of track including tie replacement and track surfacing at the MetalTech and GalvTech facilities in Pittsburgh to maintain safe rail operations

    Rail Freight Infrastructure

    Source →
  • WSOR

    $315,660

    WI-FRPP FY2017 · Wisconsin · 20% match

    Merrimac Bridge rehab Phase I repair and design

    Freight Rail Infrastructure/Preservation

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    replace six turnouts and rehabilitate 450 feet of track at Arcelor Mittal Plate's West Yard in Coatesville to improve track conditions

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about 1.2 miles of track leading into and within RJ Corman's Allentown yard, including the replacement of ties and ballast and track surfacing to maintain track condition

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    construct approximately 2,000 feet of storage track at the United States Gypsum facility to accommodate longer unit trains and increase unloading efficiency

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    construct a rail siding from Pittsburgh and Ohio Central Railroad to W J Beitler's facility, which will provide new freight rail service

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate Gautier Steel's plant tracks including replacing ties and rail, which will improve rail and truck traffic to and from the facility

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate about one mile of track at Tyburn Railroad's Morrisville, truck transfer facility, including the replacement of 800 ties and track surfacing to maintain a state of good repair

    Rail Freight Infrastructure

    Source →
  • PA-COMBINED FY2017 · Pennsylvania

    rehabilitate Oil Creek Titusville's railroad bridge over Church Run including structural and bridge deck

    Rail Freight Infrastructure

    Source →
  • WSOR

    $5.3M

    WI-COMBINED FY2016 · Wisconsin · 10% match

    Spring Green bridge (B-256) replacement

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $4.0M

    WI-COMBINED FY2016 · Wisconsin · 10% match

    Tie replacement

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.0M

    WI-COMBINED FY2016 · Wisconsin · 10% match

    Phase 1 rail replacement

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2016 · Wisconsin · 0% match

    Rail spur tracks, unloading pit and conveyance equipment

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2016 · Wisconsin · 20% match

    Industrial lead track rehab and crossing installation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC/UP

    $29.4M

    WI-FRPP FY2015 · Wisconsin · 2% match

    Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $7.0M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab of track including ties, ballast and crossings.

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $4.1M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab track including CWR rail, switches & crossings

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.4M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab & replace 6 bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.9M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab & replace 15 bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.8M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab & replace 7 bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.7M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab or replace seven bridges.

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2015 · Wisconsin · 32.05% match

    Reconstruction of yard tracks

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2015 · Wisconsin · 0% match

    Construct a grain bin, dryer and conveying equipment

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2015 · Wisconsin · 40% match

    Grain Storage Bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.4M

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab & replace 3 bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $937,655

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab 10 road crossings.

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $590,720

    WI-COMBINED FY2015 · Wisconsin · 9.09% match

    Rehab 4 bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $205,200

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab 3 bridges

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $128,194

    WI-FRPP FY2015 · Wisconsin · 20% match

    Repair two structures and replace one structure.

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $47,982

    WI-COMBINED FY2015 · Wisconsin · 10% match

    Rehab one bridge

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR, Fitchburg, Oregon

    $3.0M

    WI-COMBINED FY2014 · Wisconsin · 8.51% match

    Track Rehab - No rail

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2014 · Wisconsin · 0% match

    Track relocation, track switch, unloading facility, bulk rail loadout

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2014 · Wisconsin · 0% match

    Grain Storage Bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2014 · Wisconsin · 20% match

    Rehab Rail Spur

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2014 · Wisconsin · 0% match

    Grain Storage Bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $6.3M

    WI-COMBINED FY2013 · Wisconsin · 10% match

    Rehab Track & Rail & Ties

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $3.5M

    WI-COMBINED FY2013 · Wisconsin · 10% match

    Rehabilitation of bridges A-532, A-534, A-536, A-538, A-540 & A-542

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.4M

    WI-COMBINED FY2013 · Wisconsin · 10% match

    Bridges B-256, B-264 & B-286 Rehab and Replacement

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.0M

    WI-COMBINED FY2013 · Wisconsin · 10% match

    Side Track Construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2013 · Wisconsin · 0% match

    Grain Storage Bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2013 · Wisconsin · 0% match

    Construct Two Grain Storage Bins

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2013 · Wisconsin · 0% match

    Fertilizer storage tank

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $354,880

    WI-FRPP FY2013 · Wisconsin · 20% match

    Rehab of bridges F-108 & F-30

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $173,499

    WI-FRPP FY2013 · Wisconsin · 20% match

    Bridge Rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC/UP

    $100,000

    WI-FRPP FY2013 · Wisconsin · 0% match

    Acquisition - Preliminary work

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $5.9M

    WI-COMBINED FY2012 · Wisconsin · 10% match

    Ph I Track rehab-Ties, Crossings, Turnouts

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2012 · Wisconsin · 2.65% match

    Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2012 · Wisconsin · 0% match

    Two Grain Storage Bins

    Freight Rail Infrastructure/Preservation

    Source →
  • E&LS

    $1.4M

    WI-FRPP FY2012 · Wisconsin · 20% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $764,484

    WI-COMBINED FY2012 · Wisconsin · 10% match

    Engineering Study

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY2011 · Wisconsin · 10% match

    Ph IIA & IIB Track rehab with CWR

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY2011 · Wisconsin · 9.68% match

    Track Rehab-Ph IIB Rail

    Freight Rail Infrastructure/Preservation

    Source →
  • E&LS

    $5.9M

    WI-COMBINED FY2011 · Wisconsin · 5% match

    Track Rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY2011 · Wisconsin · 10% match

    Rehab bridges B-190, B-318, F-26, F- 28, F- 84, F-92

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2011 · Wisconsin · 0% match

    Grain bin, conveyor, spur track

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2011 · Wisconsin · 20% match

    Track Rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2011 · Wisconsin · 0% match

    Grain bin, conveyor, rail scale

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    —

    WI-COMBINED FY2010 · Wisconsin · 0% match

    Track Rehab Phase IIA

    Freight Rail Infrastructure/Preservation

    Source →
  • FRA-HSIPR FY2010 · CA · State Agency

    The ARRA tranche of federal funding for the San Francisco-Los Angeles high-speed rail system authorized under 2008's Proposition 1A ($9B in state bonds, no completion year or cost specified in the measure itself). The $2.5B ARRA grant was "fully expended by the statutory deadline of October 2017." As of August 2025, $13.8B total had been spent system-wide; 80 miles (67%) of Central Valley guideway is complete and ready for track-laying with 58 civil structures finished, but no high-speed track has been laid anywhere. Revenue service on the Merced-Bakersfield initial segment is now projected for 2032, with full system cost estimated at $89-128B.

    High Speed Rail

    Source →
  • FRA-HSIPR FY2010 · IL · State Agency

    Chicago-to-Moline (Quad Cities) Amtrak passenger service, announced October 25, 2010 with $230M in federal funding and a promised 2015 service start. BNSF-owned-track improvements and the Moline station are complete; the Wyanet-Moline segment on Iowa Interstate Railroad-owned track only reached a formal Preliminary Engineering agreement (IAIS/IDOT/BNSF/Amtrak) on September 30, 2024, now under FRA review. As of mid-2026, service has still not started (current target: 2027), and the federal funding underpinning the remaining work was set to expire July 31, 2026, with lawmakers publicly calling for an extension.

    Passenger Rail · Station

    Source →
  • WSOR

    $16.1M

    WI-COMBINED FY2010 · Wisconsin · 15.62% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $4.1M

    WI-FRPP FY2010 · Wisconsin · 13.04% match

    Track Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $3.0M

    WI-COMBINED FY2010 · Wisconsin · 10% match

    Track Rehab Ph III

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2010 · Wisconsin · 0% match

    Grain Transload Facility

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $4.7M

    WI-FRPP FY2009 · Wisconsin · 20% match

    Phase 2 track rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $3.5M

    WI-COMBINED FY2009 · Wisconsin · 0% match

    Phase I Track Rehab -- Ties & Ballast

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.1M

    WI-FRPP FY2009 · Wisconsin · 20% match

    Rehabilitation of bridges B-92, B-212 & F-90

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2009 · Wisconsin · 0% match

    Grain Storage

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2009 · Wisconsin · 0% match

    Spur Track & Loading Fac

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2009 · Wisconsin · 0% match

    Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $3.0M

    WI-FRPP FY2008 · Wisconsin · 20.26% match

    Track rehab phase I I - Rail

    Freight Rail Infrastructure/Preservation

    Source →
  • Amsoil

    $2.2M

    WI-FRIIP FY2008 · Wisconsin · 0% match

    Rail Spur

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2008 · Wisconsin

    Rail Spur & Grain Bins

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2008 · Wisconsin · 0% match

    Rail Spur

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $972,251

    WI-FRPP FY2008 · Wisconsin · 2.21% match

    Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $884,994

    WI-FRPP FY2008 · Wisconsin · 20% match

    Ph IB, Tie and Ballast

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $600,000

    WI-FRPP FY2008 · Wisconsin · 0% match

    Exercise Option on Waterloo to Watertown Segment

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2008 · Wisconsin · 0% match

    High speed loading leg

    Freight Rail Infrastructure/Preservation

    Source →
  • AK-LEG-CAPEX FY2007 · AK · State Agency

    A three-lane, 1.74-mile toll bridge across Cook Inlet's Knik Arm connecting Anchorage and the Matanuska-Susitna Borough, budgeted at $93.6M in federal receipts for FY2007 alone (design/construction phase timeline given as 07/01/2006-06/30/2011). Wikipedia separately documents "more than seven years and approximately $53 million" spent on studies, preliminary design, PR and cost estimating by December 2010. The bridge was never built; Governor Bill Walker vetoed funding in both 2014 and 2018, and the project remains dormant.

    Toll Bridge

    Source →
  • WSOR

    $2.4M

    WI-FRPP FY2007 · Wisconsin · 15.91% match

    Track rehab phase I -- ties

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.2M

    WI-FRIIP FY2007 · Wisconsin · 0% match

    Wireless Communication System

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2007 · Wisconsin · 0% match

    Corn Gluten fac., denaturant storage & wheet rec & loadout

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.2M

    WI-FRPP FY2007 · Wisconsin · 0% match

    Exercise Option on Madison to Waterloo Segment

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2007 · Wisconsin · 0% match

    Bin, Rail Scale, unload pit & grain cleaner

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.1M

    WI-FRPP FY2007 · Wisconsin · 20% match

    Bridge Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2007 · Wisconsin · 0% match

    105 ft dia grain bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2007 · Wisconsin · 0% match

    Extend & upgrade siding; construct grain and fertilizer storage

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2007 · Wisconsin · 0% match

    Grain storage bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $370,754

    WI-FRPP FY2007 · Wisconsin · 20% match

    Ph IA, Tie and Ballast

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $175,000

    WI-FRPP FY2007 · Wisconsin

    Acquisition of Easement

    Freight Rail Infrastructure/Preservation

    Source →
  • Coop Plus

    $35,205

    WI-FRIIP FY2007 · Wisconsin · 0% match

    Fall protection & car puller

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2006 · Wisconsin · 0% match

    Track & loadout

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2006 · Wisconsin · 0% match

    Sidetrack, Ethanol Storage & DDG storage

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.6M

    WI-FRPP FY2006 · Wisconsin · 20.22% match

    Rehabilitation Phase II - Rail

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2006 · Wisconsin · 0% match

    Grain bin & loadout

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY2006 · Wisconsin · 20% match

    Rehab spur track

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $429,190

    WI-FRPP FY2006 · Wisconsin · 23.62% match

    Track rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2006 · Wisconsin · 0% match

    Fertilizer shed & rail loadout

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.3M

    WI-FRPP FY2005 · Wisconsin · 20% match

    Track Rehab Phase I

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY2005 · Wisconsin · 10.69% match

    Rehabilitation Phase I

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.7M

    WI-FRPP FY2005 · Wisconsin · 11.81% match

    Acquisition - Land and Track

    Freight Rail Infrastructure/Preservation

    Source →
  • WNRR

    $1.4M

    WI-FRIIP FY2005 · Wisconsin · 0% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2005 · Wisconsin · 0% match

    Rail siding, DDG storage & loadout

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2005 · Wisconsin · 0% match

    Grain Bin

    Freight Rail Infrastructure/Preservation

    Source →
  • Coop Plus

    $41,830

    WI-FRIIP FY2005 · Wisconsin · 0% match

    Fall protection

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2004 · Wisconsin · 0% match

    Rail Sidings, Grain Storage and Ethanol Pipeline and Storage Tank

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2004 · Wisconsin · 0% match

    Grain Bin and Conveyor

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2004 · Wisconsin · 0% match

    Grain Bins

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $979,330

    WI-FRPP FY2004 · Wisconsin · 20% match

    Rehabilitation, phase II

    Freight Rail Infrastructure/Preservation

    Source →
  • Futurewood

    $775,000

    WI-FRIIP FY2004 · Wisconsin · 0% match

    Siding & wood product transload

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2004 · Wisconsin · 0% match

    Grain Facility Expansion

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2004 · Wisconsin · 0% match

    Grain Facility Expansion

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $5.2M

    WI-FRPP FY2003 · Wisconsin · 0% match

    Option to Acquire

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2003 · Wisconsin · 0% match

    Spur track & liquid fertilizer storage

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2003 · Wisconsin · 0% match

    Grain Storage Bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2003 · Wisconsin · 0% match

    Liquid Fertilizer loadout & storage

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2003 · Wisconsin · 0% match

    Grain bins

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $422,698

    WI-FRPP FY2003 · Wisconsin · 20% match

    Rehabilitation, phase I

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $2.5M

    WI-COMBINED FY2002 · Wisconsin · 16.38% match

    Rehabilitation, phase II

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2002 · Wisconsin · 0% match

    Grain Facility and Track

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2002 · Wisconsin · 0% match

    Grain Facility Expansion

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2002 · Wisconsin · 0% match

    Warehouse expansion

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $720,000

    WI-FRPP FY2002 · Wisconsin · 30.74% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $479,180

    WI-FRPP FY2002 · Wisconsin · 19.65% match

    Stabilization of bridge 428b

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.6M

    WI-COMBINED FY2001 · Wisconsin · 14.33% match

    Rehabilitation, phase I

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2001 · Wisconsin · 0% match

    Siding Construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2001 · Wisconsin · 0% match

    Fertilizer facility & sidetrack

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2001 · Wisconsin · 0% match

    Grain Facility & sidetrack

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2001 · Wisconsin · 0% match

    Facility & sidetrack construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2001 · Wisconsin · 0% match

    Grain Bin construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2000 · Wisconsin · 0% match

    Rehabilitation, phases III & IV

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.1M

    WI-COMBINED FY2000 · Wisconsin · 7.5% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $920,747

    WI-COMBINED FY2000 · Wisconsin · 9.17% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2000 · Wisconsin · 0% match

    Grain Bin & Facilities

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY2000 · Wisconsin · 0% match

    Warehouse expansion

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY2000 · Wisconsin · 0% match

    Facility Construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1999 · Wisconsin · 0% match

    Facility construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY1999 · Wisconsin · 6.46% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1999 · Wisconsin · 0% match

    Rehabilitation Phase II

    Freight Rail Infrastructure/Preservation

    Source →
  • Fitchburg / Oregon

    $859,985

    WI-FRPP FY1999 · Wisconsin · 12.09% match

    Line acqusition

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $816,620

    WI-FRPP FY1999 · Wisconsin · 20% match

    Rehab

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY1999 · Wisconsin · 6.71% match

    Substitute Service

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1999 · Wisconsin · 33.99% match

    Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1998 · Wisconsin · 0% match

    2nd Main , Phase I

    Freight Rail Infrastructure/Preservation

    Source →
  • WSOR

    $1.4M

    WI-COMBINED FY1998 · Wisconsin · 16.93% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1998 · Wisconsin · 0% match

    Line rehabilitation, Phase I

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1998 · Wisconsin · 0% match

    Construct rail served grain bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1998 · Wisconsin · 0% match

    Siding construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1998 · Wisconsin · 0% match

    Reconstruct grain loading spout

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1998 · Wisconsin · 20% match

    Siding construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1998 · Wisconsin · 20% match

    Power switch installation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1997 · Wisconsin · 0% match

    Construct rail siding

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-COMBINED FY1997 · Wisconsin · 9.54% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1997 · Wisconsin · 26.18% match

    Track consolidation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1997 · Wisconsin · 0% match

    Construct rail served warehouse

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1997 · Wisconsin · 0% match

    Construct rail served grain bin

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $3.2M

    WI-COMBINED FY1996 · Wisconsin · 5.14% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1996 · Wisconsin · 0% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1996 · Wisconsin · 0% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1996 · Wisconsin · 0% match

    Construct rail siding

    Freight Rail Infrastructure/Preservation

    Source →
  • Badger Grain

    $169,000

    WI-FRIIP FY1996 · Wisconsin · 12.89% match

    Rail spur construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1996 · Wisconsin · 0% match

    Rail spur construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1996 · Wisconsin · 0% match

    Rail spur construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 0% match

    Track consolidation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $3.9M

    WI-COMBINED FY1995 · Wisconsin · 18.21% match

    Track Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 0% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 0% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 20% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 0% match

    Log loading area improvements

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1995 · Wisconsin · 21.61% match

    Line acquisition and rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $600,000

    WI-FRPP FY1995 · Wisconsin · 0% match

    Acquisition

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 0% match

    Log loading area improvements

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1995 · Wisconsin · 18.74% match

    Rail spur construction

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1994 · Wisconsin · 0% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRIIP FY1994 · Wisconsin · 0% match

    Line rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $4.5M

    WI-COMBINED FY1993 · Wisconsin · 5.52% match

    Phase V Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $3.7M

    WI-COMBINED FY1993 · Wisconsin · 5% match

    Phase IV Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $5.1M

    WI-COMBINED FY1992 · Wisconsin · 5% match

    Phase II Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $4.5M

    WI-COMBINED FY1992 · Wisconsin · 5% match

    Phase III Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $88,000

    WI-FRPP FY1991 · Wisconsin · 20% match

    Construct run-around track

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $3.4M

    WI-FRPP FY1990 · Wisconsin · 0% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $863,504

    WI-COMBINED FY1990 · Wisconsin · 5% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $4.0M

    WI-COMBINED FY1989 · Wisconsin · 19.4% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $234,521

    WI-FRPP FY1989 · Wisconsin · 24.07% match

    Construction of interchange and track rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1989 · Wisconsin · 20% match

    Rehabilitation of Grade Crossings

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $4.3M

    WI-FRPP FY1988 · Wisconsin · 20% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WRRTC

    $417,805

    WI-FRPP FY1988 · Wisconsin · 20% match

    Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • EWCRC

    $184,634

    WI-FRPP FY1987 · Wisconsin · 0% match

    Substitute Service track & turnout work

    Freight Rail Infrastructure/Preservation

    Source →
  • EWCRC

    $48,190

    WI-FRPP FY1987 · Wisconsin · 0% match

    Substitute Service track & turnout work

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1985 · Wisconsin · 20% match

    Phase I Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1985 · Wisconsin · 0% match

    Track rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1985 · Wisconsin · 80% match

    Phase II Rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →
  • WI-FRPP FY1983 · Wisconsin · 0% match

    Track rehabilitation

    Freight Rail Infrastructure/Preservation

    Source →

Program Track Record

Funded totals for every program with a confirmed award on record. Win rate only shows where we actually have applied-but-not-funded records to compare against — most programs here are award-only data, same caveat as the rest of this page.

A note on how to read this

This is a record of who won, not a formula for winning — we don't know who applied and didn't, so a pattern here describes real precedent, not a guarantee. Every figure traces to a source you can check yourself; we don't estimate or round. Covers 16 programs so far.